
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<atom:link href="https://thenarwhal.ca/feed/" rel="self" type="application/rss+xml" />
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description>The Narwhal’s team of investigative journalists dives deep to tell stories about the natural world in Canada you can’t find anywhere else.</description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Tue, 21 Jul 2026 12:46:02 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>PRGT pipeline hit with warning letter for environmental violations</title>
      <link>https://thenarwhal.ca/bc-prgt-warning-letter-infractions-bats/?utm_source=rss</link>
			<guid isPermaLink="false">https://thenarwhal.ca/?p=133544</guid>
			<pubDate>Mon, 17 Mar 2025 23:15:30 +0000</pubDate>			
			<description><![CDATA[Pipeline workers failed to properly assess endangered bat habitat before clearing land in northwest British Columbia. The project could be fined up to $1 million, according to a warning letter sent by B.C. officials]]></description>
			<content:encoded><![CDATA[<figure><img width="1400" height="933" src="https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-1400x933.jpg" class="attachment-banner size-banner wp-post-image" alt="Aerial view over a small rural community with low clouds and mountains beyond" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-1400x933.jpg 1400w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-800x533.jpg 800w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-1024x682.jpg 1024w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-768x512.jpg 768w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-1536x1023.jpg 1536w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-2048x1365.jpg 2048w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-450x300.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-20x13.jpg 20w" sizes="(max-width: 1400px) 100vw, 1400px" /><figcaption><small><em>Photo: Marty Clemens / The Narwhal</em></small></figcaption></figure> 




<p>The <a href="https://thenarwhal.ca/topics/prince-rupert-gas-transmission-pipeline/">Prince Rupert Gas Transmission (PRGT) pipeline</a> has received a warning letter from the BC Environmental Assessment Office for &ldquo;failing to properly mark environmentally sensitive areas&rdquo; and failing to fully survey potential bat hibernation sites and roosts before clearing land last fall.&nbsp;</p>



<p>The <a href="https://www.projects.eao.gov.bc.ca/api/public/document/67cb257575901000211628be/download/PRGTRA_20240051_WN001.pdf" rel="noopener">warning letter</a> was sent to the pipeline&rsquo;s owners, U.S.-based Western LNG and Nisg&#817;a&rsquo;a Lisims Government, on March 3 and published on March 14. It&rsquo;s for apparent violations first noted during an <a href="https://projects.eao.gov.bc.ca/api/public/document/67cb24d575901000211628a6/download/PRGTRA_20240051_IR001.pdf" rel="noopener">inspection</a> on Oct. 2, 2024, when a compliance and enforcement office with the assessment office visited pipeline construction sites on Nisg&#817;a&rsquo;a territory, northwest of Terrace, B.C.&nbsp;</p>



<p>The provincial officer cited inconsistencies between required surveys for the presence of bats and the timing of clearing the pipeline right of way, noting workers cleared land before they &ldquo;identified the presence of big brown or silver-haired bats emerging and in the vicinity&rdquo; and concluding &ldquo;these findings provide evidence of non-compliance.&rdquo; Silver-haired bats are listed as endangered in Canada, due to dramatic population declines in recent years.</p>






<p>In its warning letter, the province noted the maximum penalty for failing to comply with an environmental assessment certificate is $1 million and, on subsequent convictions, up to $2 million for each violation.&nbsp;</p>



<p>Construction of the 800-kilometre PRGT natural gas pipeline was paused when its environmental assessment certificate expired last November. B.C.&rsquo;s new Environment and Parks Minister Tamara Davidson will decide this spring whether or not to grant the project a &ldquo;substantial start&rdquo; decision, which would lock in its environmental approval indefinitely and allow construction to resume.</p>



<p>If built, the PRGT line would connect natural gas reserves in B.C.&rsquo;s northeast &mdash; largely extracted by fracking, a water-intensive process that has been <a href="https://thenarwhal.ca/bc-ranchers-fracking-earthquakes-water/">linked to earthquakes</a> and human health issues &mdash; to a proposed gas liquefaction and export facility, <a href="https://thenarwhal.ca/bc-ksi-lisims-lng-facility-explainer/">Ksi Lisims LNG</a>, near the mouth of the Nass River close to the Alaska border. Its name comes from its original route, which was slated to terminate in Prince Rupert.</p>



<p>The pipeline project, which was previously owned by <a href="https://thenarwhal.ca/tag/tc-energy/">TC Energy</a>, the Calgary-based company that built the contentious <a href="https://thenarwhal.ca/topics/coastal-gaslink-pipeline-cgl/">Coastal GasLink pipeline</a>, was originally approved in 2014. TC Energy sold the pipeline to Nisga&rsquo;a Lisims Government and Texas-based Western LNG last year. The Nisg&#817;a&rsquo;a government and Western LNG, along with Calgary-based Rockies LNG, are also partners in the proposed Ksi Lisims LNG facility.&nbsp;</p>



<p>As pipeline construction began last fall, Hereditary Chiefs from neighbouring Gitanyow Nation <a href="https://thenarwhal.ca/gitanyow-hereditary-chiefs-burn-prgt-agreement/">burned a benefits agreement they signed with TC Energy</a> and closed their territories to all traffic related to the new pipeline. A few days later, Indigenous and non-Indigenous groups launched <a href="https://ecojustice.ca/news/community-groups-challenge-bc-regulator-for-bending-rules-and-bypassing-legal-steps-as-construction-of-900-km-fracked-gas-pipeline-is-set-to-begin/" rel="noopener">legal action</a> against the project, alleging the BC Energy Regulator broke its own rules to green light construction. That was followed shortly by <a href="https://thenarwhal.ca/ksi-lisims-lng-new-legal-challenge/">legal action against the proposed liquefaction plant</a>.</p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Matt Simmons]]></dc:creator>
			<category domain="post_cat"><![CDATA[News]]></category>			<category domain="post_tag"><![CDATA[B.C.]]></category><category domain="post_tag"><![CDATA[oil and gas]]></category><category domain="post_tag"><![CDATA[Prince Rupert Gas Transmission pipeline]]></category><category domain="post_tag"><![CDATA[TC Energy]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-1400x933.jpg" fileSize="136504" type="image/jpeg" medium="image" width="1400" height="933"><media:credit>Photo: Marty Clemens / The Narwhal</media:credit><media:description>Aerial view over a small rural community with low clouds and mountains beyond</media:description></media:content><media:thumbnail url="https://thenarwhal.ca/wp-content/uploads/2025/03/NisgaPollCeremony-63-1400x933.jpg" width="1400" height="933" />    </item>
	</channel>
</rss>