
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<atom:link href="https://thenarwhal.ca/feed/" rel="self" type="application/rss+xml" />
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description>The Narwhal’s team of investigative journalists dives deep to tell stories about the natural world in Canada you can’t find anywhere else.</description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Mon, 18 May 2026 14:50:19 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>Half of British Columbians Support Review or Cancellation of Site C Dam</title>
      <link>https://thenarwhal.ca/half-british-columbians-support-review-or-cancellation-site-c-dam/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2017/06/20/half-british-columbians-support-review-or-cancellation-site-c-dam/</guid>
			<pubDate>Tue, 20 Jun 2017 19:54:43 +0000</pubDate>			
			<description><![CDATA[Almost exactly a year ago, B.C. Hydro&#160;touted&#160;&#8220;broad support&#8221; for its controversial Site C dam &#8212; a mega hydro dam on the Peace River that would flood 107 kilometres of river valley, forcing farmers and First Nations off their land. Now, as besieged Premier Christy Clark puts all her spin doctoring powers to work to attempt...]]></description>
			<content:encoded><![CDATA[<figure><img width="826" height="549" src="https://thenarwhal.ca/wp-content/uploads/2018/04/©Garth-Lenz-5753-1.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/©Garth-Lenz-5753-1.jpg 826w, https://thenarwhal.ca/wp-content/uploads/2018/04/©Garth-Lenz-5753-1-760x505.jpg 760w, https://thenarwhal.ca/wp-content/uploads/2018/04/©Garth-Lenz-5753-1-450x299.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/©Garth-Lenz-5753-1-20x13.jpg 20w" sizes="(max-width: 826px) 100vw, 826px" /><figcaption><small><em></em></small></figcaption></figure> <p>Almost exactly a year ago, B.C. Hydro&nbsp;<a href="https://thenarwhal.ca/2016/06/13/opposition-site-c-dam-has-doubled-and-other-facts-bc-hydro-trying-bury">touted&nbsp;&ldquo;broad support&rdquo;</a> for its controversial Site C dam &mdash; a mega hydro dam on the Peace River that would flood 107 kilometres of river valley, forcing farmers and First Nations off their land.</p>
<p>Now, as besieged Premier Christy Clark puts all her <a href="https://thenarwhal.ca/2017/06/07/christy-clark-s-dangerous-site-c-propaganda-war">spin doctoring powers to work</a> to attempt to save the dam from being canned, <a href="http://angusreid.org/wp-content/uploads/2017/06/2017.06.20-BC-post-elxn.pdf" rel="noopener">new polling from Angus Reid</a> shows that more British Columbians want to review or cancel the project than want to let the project go ahead.</p>
<p>Those numbers are pretty remarkable when you consider that Site C is already almost two years into construction and BC Hydro has put considerable resources into <a href="https://thenarwhal.ca/2017/01/31/bc-hydro-shows-trump-style-attacks-media-can-and-do-happen-canada">quieting critical media coverage</a> of the project.&nbsp;</p>
<p><!--break--></p>
<p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/Screen%20Shot%202017-06-20%20at%2011.22.39%20AM.png"></p>
<p>Back in 2013 only <a href="https://thenarwhal.ca/2014/05/22/only-four-10-british-columbians-have-heard-mega-project-have-you">four in 10 British Columbians</a> had even heard of the $9 billion mega project. Now public opinion on the Site C dam is neck and neck with that on <a href="https://thenarwhal.ca/kinder-morgan-trans-mountain-pipeline">Kinder Morgan&rsquo;s Trans Mountain pipeline</a>, with equivalent numbers of British Columbians supporting cancelling the projects or sending them for further review.</p>
<p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/Screen%20Shot%202017-06-20%20at%2012.31.33%20PM.png"></p>
<p>B.C. Hydro hinged public support for the project on the premise of growing electricity demand, a notion critics like Site C Joint Review Panel <a href="https://thenarwhal.ca/2016/06/20/no-need-site-c-review-panel-chair-speaks-out-against-dam-new-video">Harry Swain</a> and analysts from UBC have argued is <a href="https://thenarwhal.ca/2017/04/19/five-facepalm-worthy-facts-ubc-s-new-analysis-site-c-dam">unfounded</a>.</p>
<p>Since 2005, demand for electricity in B.C. has flatlined. According to a new <a href="https://thenarwhal.ca/2017/04/20/b-c-scales-down-energy-saving-measures-manufacture-demand-site-c-ubc-report">report</a> by the Program on Water Governance at UBC,&nbsp;B.C. Hydro has curtailed energy saving measures in order to drive up electricity consumption and manufacture demand for Site C.</p>
<p></p>
<p>Reader-funded <a href="https://thenarwhal.ca/2016/11/16/video-70-british-columbians-support-pausing-site-c-dam-construction-poll">polling commissioned by DeSmog Canada</a> last fall indicated that if demand for more power arises in the future, nine in ten British Columbians support investing in energy efficiency measures (92 per cent) and adding more wind, solar and geothermal power to the grid as needed (also 92 per cent). Just over a third (37 per cent) favour building large hydro dams.</p>
<p>The same poll indicated 73 per cent of British Columbians support sending the Site C dam for an independent review of both costs and demand, something the NDP-Green alliance has <a href="https://thenarwhal.ca/2017/05/30/site-c-dam-set-finally-undergo-review-costs-and-demand">vowed to do immediately </a>upon taking power.</p>
<p>
</p><p><em>Image: Site C construction on the banks of the Peace River. Photo: Garth Lenz | DeSmog Canada</em></p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Emma Gilchrist]]></dc:creator>
						<category domain="post_tag"><![CDATA[Analysis]]></category><category domain="post_tag"><![CDATA[Center Top]]></category><category domain="post_tag"><![CDATA[Kinder Morgan Trans Mountain pipeline]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[Site C dam]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/©Garth-Lenz-5753-1-760x505.jpg" fileSize="4096" type="image/jpeg" medium="image" width="760" height="505"><media:credit></media:credit></media:content>	
    </item>
	</channel>
</rss>