
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<atom:link href="https://thenarwhal.ca/feed/" rel="self" type="application/rss+xml" />
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description>The Narwhal’s team of investigative journalists dives deep to tell stories about the natural world in Canada you can’t find anywhere else.</description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Fri, 15 May 2026 02:39:16 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>Ontario Must Stand Its Ground On Line 9</title>
      <link>https://thenarwhal.ca/ontario-must-stands-its-ground-line-9/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2014/01/14/ontario-must-stands-its-ground-line-9/</guid>
			<pubDate>Tue, 14 Jan 2014 18:55:13 +0000</pubDate>			
			<description><![CDATA[The recent oil train derailment and subsequent explosion in North Dakota was yet another reminder tighter regulations and more independent research on transporting oil is needed &#8212; particularly where volatile shale oil is concerned. Last week another reminder hit close to home when a CN Rail train carrying crude oil derailed and caught fire in...]]></description>
			<content:encoded><![CDATA[<figure><img width="468" height="365" src="https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-01-14-at-10.58.53-AM.png" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-01-14-at-10.58.53-AM.png 468w, https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-01-14-at-10.58.53-AM-300x234.png 300w, https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-01-14-at-10.58.53-AM-450x351.png 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-01-14-at-10.58.53-AM-20x16.png 20w" sizes="(max-width: 468px) 100vw, 468px" /><figcaption><small><em></em></small></figcaption></figure> <p>The recent oil train derailment and subsequent <a href="http://www.bloomberg.com/news/2013-12-31/train-carrying-oil-in-north-dakota-ablaze-after-derailing.html" rel="noopener">explosion in North Dakota</a> was yet another reminder tighter regulations and more independent research on transporting oil is needed &mdash; particularly where <a href="http://sanfrancisco.cbslocal.com/2014/01/11/trains-carrying-fracked-oil-may-pose-dangers-to-bay-area/" rel="noopener">volatile shale oil </a>is concerned. Last week another reminder hit close to home when a CN Rail train carrying crude oil <a href="https://thenarwhal.ca/2014/01/08/mechanical-failure-causes-cn-rail-train-carrying-crude-derail-ignite-new-brunswick">derailed and caught fire</a> in New Brunswick.</p>
<p>The responsibility of protecting Canadians from an oil transportation disaster has largely fallen to the provinces while the federal government has <a href="http://www.thestar.com/news/canada/2013/10/22/lac_megantic_report_pins_blame_on_weak_government_regulation.html" rel="noopener">weakened or eliminated rules and regulations</a> that get in the way of its priority to sell as much Canadian oil as possible.&nbsp;</p>
<p><!--break--></p>
<p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/Map%20-%20Line%209.png"></p>
<p>By the end of this month the federal pipeline regulator, the <a href="http://www.neb-one.gc.ca/clf-nsi/index.html" rel="noopener">National Energy Board (NEB)</a>, is expected to approve Enbridge&rsquo;s proposal for its 38-year old <a href="http://www.enbridge.com/ECRAI/Line9BReversalProject.aspx" rel="noopener">Line 9 oil pipeline</a> in Ontario and Quebec, which would carry shale oil &mdash; known for its propensity to explode as it did in North Dakota.</p>
<p>The NEB is not in the habit of rejecting pipeline projects (<a href="https://thenarwhal.ca/2013/12/19/scenic-photos-high-point-panel-s-report-enbridge-northern-gateway-oil-pipeline-proposal">see Northern Gateway&rsquo;s approval</a>). With that in mind, the province of Ontario must hold its ground on Line 9 and ensure its demands for a safer pipeline are met.</p>
<p>While the province could have gone further with its demands, two of the conditions &mdash; a hydrostatic test of Line 9 and a third-party independent review &mdash; have the greatest potential of reducing the risk of a Line 9 rupture.</p>
<p>The first, hydrostatic testing, is the gold standard for pipeline safety. By pumping water through Line 9 at a slightly higher pressure than its proposed maximum allowable operating pressure, the test can help establish if Line 9 can operate safely at the maximum pressure. It can also identify weak points in the pipeline that need replacing.</p>
<p>The third-party independent review would entail an independent expert looking over Enbridge&rsquo;s data on Line 9 and would eliminate reliance on Enbridge&rsquo;s conclusions without duplicating the NEB process.</p>
<p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/enbridge-logo-on-pipeline.jpg"></p>
<p>The least Ontario can do is flex whatever legislative muscle it can muster to ensure compliance with its conditions. Enbridge would do best to adopt these conditions given the company&rsquo;s reputation as the &ldquo;<a href="http://www.theglobeandmail.com/report-on-business/industry-news/energy-and-resources/enbridge-slammed-for-keystone-kops-response-to-michigan-spill/article4402752/" rel="noopener">Keystone Kops</a>&rdquo; of oil pipeline safety for their bungling of a 2010 oil spill in Michigan, resulting in three million litres of bitumen spilling over the course of 17 hours.</p>
<p>None of this is to say Ontarians should settle for the Line 9 pipeline. Opposition to transporting oilsands bitumen via Line 9 will continue. The jury is still out on whether bitumen is rougher on pipelines than conventional oil and the difficulties of cleaning up a bitumen spill are well known. Expansion of the greenhouse gas intensive Albertan <a href="http://www.theglobeandmail.com/report-on-business/industry-news/energy-and-resources/ontario-must-stand-ground-on-pipeline-projects-says-report/article15371354/" rel="noopener">oilsands completely overshadows Ontario&rsquo;s efforts</a> to reduce its own greenhouse gas emissions.</p>
<p>And while Ontario expressed how important proper consultations with Ontario&rsquo;s First Nations on Line 9 are, this was not one of the province&rsquo;s conditions. It would be hard to find a clearer case of the <a href="https://thenarwhal.ca/2013/11/05/federal-government-failed-consult-first-nations-line-9">failure to consult with First Nations</a> than that of Line 9.</p>
<p>Still, while the conditions are far from perfect, the province must not be allowed to make demands for pipeline safety they never intend on backing up. Ontario has not breathed a word about its conditions since it <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/1045209/1050178/A3Q0Y6_%2D_13%2D10%2D17_%2D_Volume_6.pdf?nodeid=1050225&amp;vernum=-2" rel="noopener">presented them to the NEB in a public hearing on Line 9 </a>in October.</p>
<p>Provinces are still responsible for the land, the water and the people within their borders. Failing to act on a pipeline proposal that threatens all of the above would blatantly ignore that responsibility.&nbsp;Oil train explosions and pipeline ruptures cannot be considered the price of doing business.</p>
<p><em>Image Credits: Enbridge <a href="http://www.enbridge.com/ECRAI/~/media/www/Site%20Documents/Delivering%20Energy/Projects/Line9/Line9BrochureEN.PDF" rel="noopener">Line 9 Report</a>, Enridge, Pipeline Observer</em></p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Derek Leahy]]></dc:creator>
			<category domain="post_cat"><![CDATA[Opinion]]></category>			<category domain="post_tag"><![CDATA[alberta oil sands]]></category><category domain="post_tag"><![CDATA[alberta tar sands]]></category><category domain="post_tag"><![CDATA[Bakken shale oil]]></category><category domain="post_tag"><![CDATA[crude oil]]></category><category domain="post_tag"><![CDATA[crude-by-rail]]></category><category domain="post_tag"><![CDATA[Enbridge]]></category><category domain="post_tag"><![CDATA[line 9]]></category><category domain="post_tag"><![CDATA[National Energy Board (NEB)]]></category><category domain="post_tag"><![CDATA[NEB]]></category><category domain="post_tag"><![CDATA[oil and gas pipelines]]></category><category domain="post_tag"><![CDATA[Ontario]]></category><category domain="post_tag"><![CDATA[Opinion]]></category><category domain="post_tag"><![CDATA[pipelines]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-01-14-at-10.58.53-AM-300x234.png" fileSize="4096" type="image/png" medium="image" width="300" height="234"><media:credit></media:credit></media:content>	
    </item>
	</channel>
</rss>