
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description><![CDATA[Deep Dives, Cold Facts, &#38; Pointed Commentary]]></description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Tue, 05 May 2026 05:12:39 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>After the Mining Rush: A Visit to Faro Mine, One of Canada’s Costliest, Most Contaminated Sites</title>
      <link>https://thenarwhal.ca/photos-view-sky-over-faro-mine-one-canada-s-costliest-most-contaminated-sites/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2017/08/08/photos-view-sky-over-faro-mine-one-canada-s-costliest-most-contaminated-sites/</guid>
			<pubDate>Tue, 08 Aug 2017 20:42:24 +0000</pubDate>			
			<description><![CDATA[The Yukon&#8217;s giant Faro Mine was once the world’s largest open-pit lead and zinc mine. In operation from 1969 to 1998, when its last owner declared bankruptcy, the mine once generated more than 30 per cent of the Yukon&#8217;s economic activity. Now, Faro Mine is considered the second-worst contaminated site in Canada. After nearly 20...]]></description>
			<content:encoded><![CDATA[<figure><img width="1400" height="640" src="https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-1400x640.jpg" class="attachment-banner size-banner wp-post-image" alt="Faro Mine" decoding="async" srcset="https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-1400x640.jpg 1400w, https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-760x348.jpg 760w, https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-1024x468.jpg 1024w, https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-1920x878.jpg 1920w, https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-450x206.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-20x9.jpg 20w" sizes="(max-width: 1400px) 100vw, 1400px" /><figcaption><small><em></em></small></figcaption><hr></figure><p>The Yukon&rsquo;s giant<a href="http://www.faromine.ca/" rel="noopener"> Faro Mine</a> was once the world&rsquo;s largest open-pit lead and zinc mine.<p>In operation from 1969 to 1998, when its last owner declared bankruptcy, the mine once generated more than 30 per cent of the Yukon&rsquo;s economic activity.</p><p>Now, Faro Mine is considered the <a href="http://www.whitehorsestar.com/News/abandoned-site-will-require-care-forever" rel="noopener">second-worst contaminated site in Canada</a>.</p><p>After nearly 20 years of maintenance and remediation planning, more than $350 million has been spent via the <a href="http://www.federalcontaminatedsites.gc.ca/default.asp?lang=en" rel="noopener">Federal Contaminated Sites Action Plan</a> but remediation isn&rsquo;t expected to begin until 2022.</p><p>Indigenous and Northern Affairs Canada has released a timeline and draft details on the remediation plan for the Faro Mine and is currently <a href="https://www.aadnc-aandc.gc.ca/eng/1480019546952/1480019612738#sct3" rel="noopener">seeking public input</a>.</p><p>Remediation activity is currently expected to cost $500 million over 10 to 15 years. The biggest cost of remediation will be covering 320 million tonnes of waste rock and 70 million tonnes of tailings. Indigenous and Northern Affairs Canada says the waste would cover 26,179 football fields, one metre deep.</p><p>Without remediation, the Pelly and Yukon Rivers could be polluted with toxic metals.</p><p>The Narwhal (then DeSmog Canada) sent photographer Matt Jacques to Faro to see the mine&rsquo;s toxic legacy first-hand.</p><img width="1920" height="1013" src="https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-Mine-Anvil-Range-1920x1013.jpg" alt="Faro Mine"><p><small><em>Located in south-central Yukon, the community of Faro was established in 1968 to service the open-pit lead/zinc Faro mine, some 15 kilometres north in the mountains of the Anvil Range. The town derives its name from a card game, which was one of the most popular forms of gambling in the late 19th century. Photo: Matt Jacques / The Narwhal</em></small></p><img src="https://thenarwhal.ca/wp-content/uploads/files/DeSmog%20-%20Faro%20Mine%20Story-2.jpg" alt="Faro Mine abandoned homes"><p><small><em>Abandoned homes in Anvil Range. Photo: Matt Jacques / The Narwhal</em></small></p><p>Home to more than 2,000 residents at the peak of the mine&rsquo;s operation, the current population sits at 348, leaving many buildings and entire residential blocks unoccupied.</p><img src="https://thenarwhal.ca/wp-content/uploads/files/DeSmog%20-%20Faro%20Mine%20Story-3.jpg" alt="Faro mine"><p><small><em>Remediation at the Faro mine is not expected to begin until 2022. Photo: Matt Jacques / The Narwhal</em></small></p><p>The Faro Mine occupies more than 25 square kilometres, roughly 25 per cent larger in area than the city of Victoria, B.C. At one point, it was the world&rsquo;s largest open-pit lead/zinc mine.</p><p>In addition to this primary mine, there are two smaller open-pit mines on site.</p><img width="1920" height="1279" src="https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-mine-tailings-piles-1920x1279.jpg" alt=""><p><small><em>Waste rock piles at the Faro mine. Photo: Matt Jacques / The Narwhal</em></small></p><p>Mine operations left behind more than 320 million tonnes of waste rock and 70 million tonnes of tailings before the mine&rsquo;s final closure in 1998.</p><img src="https://thenarwhal.ca/wp-content/uploads/files/DeSmog%20-%20Faro%20Mine%20Story-5.jpg" alt="Faro mine"><p><small><em>Drainage flows from the mine&rsquo;s water treatment plant toward the tailings pond below. Photo: Matt Jacques / The Narwhal</em></small></p><img width="1920" height="1253" src="https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-mine-tailings-pond-view-north-1920x1253.jpg" alt="Faro mine tailings"><p><small><em>The Faro water treatment plant sits at the northern end of the mine, while tailings make their way to the tailings pond. Photo: Matt Jacques / The Narwhal</em></small></p><img width="1920" height="1035" src="https://thenarwhal.ca/wp-content/uploads/2017/08/Faro-mine-tailings-pond-low-1920x1035.jpg" alt=""><p><small><em>The tailings pond itself stretches nearly 5 kilometres down the Rose Creek valley, and consists of multiple ponds and supporting dam structures.</em></small></p><img src="https://thenarwhal.ca/wp-content/uploads/files/DeSmog%20-%20Faro%20Mine%20Story-8.jpg" alt="Faro mine"><p><small><em>The Rose Creek tailings pond, separated from the Intermediate and Cross Valley ponds via a series of dams. Photo: Matt Jaques / The Narwhal</em></small></p><img src="https://thenarwhal.ca/wp-content/uploads/2018/10/Faro-Mine-tailings-1920x1263.jpg" alt="Faro Mine"><p><small><em>Aerial view of Rose Creek tailings pond. Photo: Matt Jacques / The Narwhal</em></small></p><img width="1500" height="1000" src="https://thenarwhal.ca/wp-content/uploads/2018/10/Faro-mine-tailings-ponds-e1540835046886.jpg" alt=""><p><small><em>When the owners of the Faro Mine declared bankruptcy in 1998, the company left behind more than 320 million tonnes of waste rock and 70 million tonnes of tailings. Aerial view of the refuse left behind in the Rose Creek tailings pond. Photo: Matt Jacques / The Narwhal</em></small></p><img width="1920" height="1217" src="https://thenarwhal.ca/wp-content/uploads/2018/10/Faro-mine-Rose-Creek-1920x1217.jpg" alt="faro mine rose creek"><p><small><em>Adjacent to the mine site, Rose Creek winds through a wetlands ecoystem that feeds the Pelly River. Without remediation the Pelly and Yukon Rivers could become contaminated by toxic metals from the Faro mine. Photo: Matt Jacques / The Narwhal</em></small></p><p>Adjacent to the mine site, Rose Creek winds through a wetlands ecoystem that feeds the Pelly River.</p><img src="https://thenarwhal.ca/wp-content/uploads/files/DeSmog%20-%20Faro%20Mine%20Story-12.jpg" alt="faro mine"><p><small><em>The Rose Creek valley downstream of the Faro mine and its tailings pond. Photo: Matt Jacques / The Narwhal</em></small></p><p>The Faro Mine remediation consultation and planning process continues, with a plan to be finalized prior to the project being submitted to the Yukon Environmental and Socio-economic Assessment Board (YESAB) in 2018.</p></p>
<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Matt Jacques]]></dc:creator>
			<category domain="post_cat"><![CDATA[Photo Essay]]></category>			<category domain="post_tag"><![CDATA[faro mine]]></category><category domain="post_tag"><![CDATA[mining]]></category><category domain="post_tag"><![CDATA[yukon]]></category>    </item>
	</channel>
</rss>