
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description><![CDATA[Deep Dives, Cold Facts, &#38; Pointed Commentary]]></description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Fri, 08 May 2026 03:22:47 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>Site C Dam Set to Finally Undergo Review of Costs and Demand</title>
      <link>https://thenarwhal.ca/site-c-dam-set-finally-undergo-review-costs-and-demand/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2017/05/30/site-c-dam-set-finally-undergo-review-costs-and-demand/</guid>
			<pubDate>Tue, 30 May 2017 23:23:06 +0000</pubDate>			
			<description><![CDATA[The controversial $9 billion Site C dam project will be sent for immediate review with the B.C. Utilities Commission if NDP Leader John Horgan becomes B.C.&#8217;s premier, according to a landmark agreement between the NDP and Greens. The agreement outlines the terms of a power-sharing agreement as well as a path forward on key election...]]></description>
			<content:encoded><![CDATA[<figure><img width="826" height="551" src="https://thenarwhal.ca/wp-content/uploads/2018/04/Horgan-Weaver-Site-C.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/Horgan-Weaver-Site-C.jpg 826w, https://thenarwhal.ca/wp-content/uploads/2018/04/Horgan-Weaver-Site-C-760x507.jpg 760w, https://thenarwhal.ca/wp-content/uploads/2018/04/Horgan-Weaver-Site-C-450x300.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/Horgan-Weaver-Site-C-20x13.jpg 20w" sizes="(max-width: 826px) 100vw, 826px" /><figcaption><small><em></em></small></figcaption></figure><p>The controversial $9 billion <a href="https://thenarwhal.ca/site-c-dam-bc"><strong>Site C dam</strong></a> project will be sent for immediate review with the B.C. Utilities Commission if NDP Leader John Horgan becomes B.C.&rsquo;s premier, according to a landmark agreement between the NDP and Greens.<p>The <a href="https://www.scribd.com/document/349886757/2017-Confidence-and-Supply-Agreement-between-the-BC-Green-Caucus-and-the-BC-New-Democrat-Caucus?secret_password=HV1YIVdpIbVM8BEv29p2#from_embed" rel="noopener">agreement</a> outlines the terms of a power-sharing agreement as well as a path forward on key election issues, including the future of the Site C dam.</p><p>The agreement sets out a requirement to &ldquo;immediately refer the Site C construction project to the B.C. Utilities Commission&rdquo; to investigate the economic viability and consequences of the project for British Columbians.</p><p>During the election campaign the Greens vowed to stop the Site C project outright while the NDP committed to send the project for independent review by the B.C. Utilities Commission, a body designed to regulate BC Hydro and electricity rates. The B.C. Liberals exempted Site C from utilities commission scrutiny.</p><p><!--break--></p><p>At a joint press conference Tuesday, Green Party Leader Andrew Weaver said he and his two fellow Green MLAs negotiated strongly with the NDP caucus on the fate of the Site C project.</p><p>&ldquo;We came in there very strong on Site C,&rdquo; Weaver said. &ldquo;We did not take this lightly.&rdquo;</p><p>The Greens pressured the soon-to-be government on the exact terms of their commitment to send the project for review, Weaver said.</p><p>&ldquo;We got a response that frankly was the right response we were looking for.&rdquo;</p><p>Premier Christy Clark, now facing an inevitable loss of confidence in the house, vowed to push the Site C project &ldquo;past the point of no return&rdquo; before the election.</p><p>In response to questions, Horgan said Site C construction will not be paused while the commission evaluates the project.</p><p>Weaver noted that although construction has not been stopped families facing eviction by B.C. Hydro have been granted an extension of time on their land.</p><p>&ldquo;The Boons have not been evicted from their property,&rdquo; Weaver said, referring to<a href="https://thenarwhal.ca/2014/09/02/field-dreams-peace-valley-farmers-ranchers-fight-keep-land-above-water-site-c-decision-looms"> Ken and Arlene Boon</a>, farmers leading the fight against Site C who were facing eviction at the end of May.</p><p>Horgan said his party&rsquo;s plan for the Site C dam, which requires considering lower cost options for the public, paved the way for the historic NDP-Green power-sharing agreement.</p><p>&ldquo;The draft document we shared with Andrew and his team, that was I think, the foundation for what allowed us to work forward together.&rdquo;</p><p>The Site C dam is the most expensive public infrastructure project in B.C.&rsquo;s history. The reservoir created by the dam will flood 107 kilometres of the Peace River, destroying<a href="https://thenarwhal.ca/2016/01/07/impact-site-c-dam-b-c-farmland-far-more-dire-reported-local-farmers-show"> thousands of hectares</a> of prized agricultural land and unique ecosystems. It has been under construction for nearly two years in what is an eight-year construction timeline.</p><p>The Site C dam is the most environmentally destructive project ever considered under the federal Canadian Environmental Assessment Act, as detailed by the federal-provincial panel tasked with reviewing the project in 2013.</p><p></p><p>That panel, chaired by Harry Swain, did not make a recommendation for or against the project because the province had <a href="https://thenarwhal.ca/2014/06/03/three-decades-and-counting-how-bc-has-failed-investigate-alternatives-site-c-dam">failed to both investigate alternatives</a>, such as geothermal, and to <a href="https://thenarwhal.ca/2017/05/16/we-just-want-truth-commercial-customers-bc-hydro-forcasts-could-lead-costly-oversupply">demonstrate the need for the power</a> Site C will generate.</p><p>In a previous interview with DeSmog Canada, Swain said, &ldquo;<a href="https://thenarwhal.ca/2016/06/20/no-need-site-c-review-panel-chair-speaks-out-against-dam-new-video">there is no need for Site C</a>.&rdquo;</p><p>&ldquo;If there was a need, we could meet it with a variety of other renewable and smaller scale sources.&rdquo;</p><p>The panel called on B.C. to send the project to the B.C. Utilities Commission, but the province ignored that recommendation and decided to forge ahead with the project.</p><p><em>Image: Green Party Leader Andrew Weaver and NDP Leader John Horgan release a joint Supply and Confidence Agreement that calls for an immediate review of the Site C project, May 30, 2017. Photo: <a href="https://www.flickr.com/photos/bcnewdemocrats/34612202540/in/dateposted/" rel="noopener">BC NDP </a>via Flickr</em></p></p>
<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Carol Linnitt]]></dc:creator>
			<category domain="post_cat"><![CDATA[News]]></category>			<category domain="post_tag"><![CDATA[andrew weaver]]></category><category domain="post_tag"><![CDATA[B.C. Utilities Commission]]></category><category domain="post_tag"><![CDATA[BC Hydro]]></category><category domain="post_tag"><![CDATA[BCUC]]></category><category domain="post_tag"><![CDATA[Harry Swain]]></category><category domain="post_tag"><![CDATA[John Horgan]]></category><category domain="post_tag"><![CDATA[NDP-Green Agreement]]></category><category domain="post_tag"><![CDATA[News]]></category><category domain="post_tag"><![CDATA[review]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[Site C dam]]></category>    </item>
	</channel>
</rss>