
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<atom:link href="https://thenarwhal.ca/feed/" rel="self" type="application/rss+xml" />
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description>The Narwhal’s team of investigative journalists dives deep to tell stories about the natural world in Canada you can’t find anywhere else.</description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Sat, 28 Nov 2026 05:23:50 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>VIDEO: Site C Dam an ‘Economic Disaster,’ Says Former Premier Mike Harcourt</title>
      <link>https://thenarwhal.ca/video-site-c-dam-economic-disaster-says-former-premier-mike-harcourt/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2017/03/02/video-site-c-dam-economic-disaster-says-former-premier-mike-harcourt/</guid>
			<pubDate>Thu, 02 Mar 2017 20:34:38 +0000</pubDate>			
			<description><![CDATA[In a sit-down video interview, former B.C. Premier Mike Harcourt told DeSmog Canada the Site C dam, proposed for the Peace River, is “a bad idea” and should be abandoned immediately. “Site C is going to be a disaster economically, environmentally, culturally for First Nations and shouldn’t be built,” Harcourt said. Site C, originally projected...]]></description>
			<content:encoded><![CDATA[<figure><img width="826" height="463" src="https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster.png" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster.png 826w, https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster-760x426.png 760w, https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster-450x252.png 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster-20x11.png 20w" sizes="(max-width: 826px) 100vw, 826px" /><figcaption><small><em></em></small></figcaption></figure> <p>In a sit-down video interview, former B.C. Premier Mike Harcourt told DeSmog Canada the <a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a>, proposed for the Peace River, is &ldquo;a bad idea&rdquo; and should be abandoned immediately.</p>
<p>&ldquo;Site C is going to be a disaster economically, environmentally, culturally for First Nations and shouldn&rsquo;t be built,&rdquo; Harcourt said.</p>
<p>Site C, originally projected to cost B.C. ratepayers $5.5 billion, is now estimated to cost $9 billion.</p>
<p>Harcourt said Site C follows a long history of <a href="http://www.cbc.ca/news/canada/new-brunswick/mactaquac-cost-overruns-1.3908868" rel="noopener">hydro project cost overruns</a>.</p>
<p>&ldquo;The average overage cost of dams worldwide over the last 70 years have averaged 90 per cent overage. So you can assume Site C is going to cost, probably, $15 billion to $17 billion dollars,&rdquo; he said.</p>
<p>https://www.facebook.com/DesmogCanada/videos/1054438974661662/</p>
<p><!--break--></p>
<p>&ldquo;I think economically it&rsquo;s just not going to cut it.&rdquo;</p>
<p>The crux of Harcourt&rsquo;s criticism of Site C, a project first proposed in the 1980s, is the lack of growth in electricity demand in the province.</p>
<p>Demand for electricity in B.C. <a href="https://thenarwhal.ca/2016/06/20/no-need-site-c-review-panel-chair-speaks-out-against-dam-new-video">has been flat</a> over the last 11 years, Harcourt said.</p>
<p>&ldquo;In that sense you don&rsquo;t need it, there&rsquo;s not the demand. Economically you&rsquo;re going to be bankrupting BC Hydro and seriously harming the credit of British Columbia.&rdquo;</p>
<p>That could deter businesses from operating in B.C., he said, all when there is no need for the power.</p>
<p>The lack of customers for Site C electricity was evidenced in Premier Christy Clark&rsquo;s suggestion the power could be <a href="https://thenarwhal.ca/2016/04/13/premier-clark-s-proposal-electrify-oilsands-site-c-dam-has-air-desperation-panel-chair">sold to Alberta to electrify the oilsands</a>.</p>
<p>Harcourt said the idea is similar to the B.C. Liberal&rsquo;s promise to create a liquefied natural gas empire..</p>
<p>&ldquo;It&rsquo;s like the LNG pipe dream,&rdquo; he said.</p>
<p>&ldquo;I haven&rsquo;t heard any expression of interest from the Alberta government and the oilsands industry in doing that. And what would the cost of the transmission line be on top of the $15 billion to $17 billion that the dam would cost?</p>
<p>&ldquo;It&rsquo;s a weak version of field of dreams: build it and hope, hope, hope there will be a customer down the line.&rdquo;</p>
<blockquote>
<p>Possible to stop <a href="https://twitter.com/hashtag/SiteC?src=hash" rel="noopener">#SiteC</a> like the 8-lane hwy once slated for NShore, <a href="https://twitter.com/hashtag/StanleyPark?src=hash" rel="noopener">#StanleyPark</a>, <a href="https://twitter.com/hashtag/Gastown?src=hash" rel="noopener">#Gastown</a> &amp; <a href="https://twitter.com/hashtag/YVR?src=hash" rel="noopener">#YVR</a> <a href="https://twitter.com/hashtag/Chinatown?src=hash" rel="noopener">#Chinatown</a> <a href="https://t.co/1CCLxu3PKz">https://t.co/1CCLxu3PKz</a> <a href="https://twitter.com/hashtag/bcpoli?src=hash" rel="noopener">#bcpoli</a> <a href="https://t.co/jTyb3H0GcE">pic.twitter.com/jTyb3H0GcE</a></p>
<p>&mdash; DeSmog Canada (@DeSmogCanada) <a href="https://twitter.com/DeSmogCanada/status/837796079131222016" rel="noopener">March 3, 2017</a></p></blockquote>
<p></p>
<p>Ongoing construction of Site C should be immediately halted, Harcourt said. &ldquo;It&rsquo;s never beyond the point of no return.&rdquo;</p>
<p>He pointed to an analogous example from the 1960s, when Harcourt was a lawyer for the Chinese community in Vancouver&rsquo;s Chinatown and Strathcona. At that time there was a plan to build an <a href="https://www.theguardian.com/cities/2016/may/09/story-cities-38-vancouver-canada-freeway-protest-liveable-city" rel="noopener">eight-lane freeway along Stanley Park</a> and through the east side of downtown Vancouver.</p>
<p>&ldquo;We stopped it cold. But we still had part of it built, the Georgia Viaducts, and now we&rsquo;re tearing them&nbsp; &mdash; at the cost of $200 million &mdash; that last part of that really bad idea.&rdquo;</p>
<p>The Site C dam is 18 months into construction on what is projected to be an eight-year timeline. So far, a worker&rsquo;s camp has been built and a small section of river valley has been cleared. Ultimately, more than 100 kilometres of river valley, including valuable farmland, will be cleared to make way for the dam&rsquo;s reservoir.</p>
<p>&ldquo;It&rsquo;s not too late,&rdquo; Harcourt said.</p>
<p>Harcourt joins <a href="https://www.facebook.com/DesmogCanada/videos/946582382113989/" rel="noopener">Harry Swain</a>, the chair of the provincial-federal panel that reviewed the Site C dam, and former <a href="https://thenarwhal.ca/2015/08/04/exclusive-site-c-dam-devastating-british-columbians-says-former-ceo-bc-hydro">BC Hydro CEO Marc Eliesen</a> in criticizing the project.</p>
<p>The provincial NDP has vowed to send the dam for an independent review by the B.C. Utilities Commission if elected in May. &nbsp;The B.C. Liberals exempted Site C from a utilities commission review and Premier Christy Clark has vowed to get the project &ldquo;past the point of no return&rdquo; before the May 9th election.</p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Carol Linnitt]]></dc:creator>
			<category domain="post_cat"><![CDATA[Video]]></category>			<category domain="post_tag"><![CDATA[Center Top]]></category><category domain="post_tag"><![CDATA[Christy Clark]]></category><category domain="post_tag"><![CDATA[cost overruns]]></category><category domain="post_tag"><![CDATA[economic disaster]]></category><category domain="post_tag"><![CDATA[electricity]]></category><category domain="post_tag"><![CDATA[Harry Swain]]></category><category domain="post_tag"><![CDATA[Mike Harcourt]]></category><category domain="post_tag"><![CDATA[Premier of B.C.]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[video]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster-760x426.png" fileSize="4096" type="image/png" medium="image" width="760" height="426" /><media:thumbnail url="https://thenarwhal.ca/wp-content/uploads/2018/04/Harcourt-Site-C-Interivew-Economic-Disaster-760x426.png" width="760" height="426" />    </item>
	</channel>
</rss>