
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<atom:link href="https://thenarwhal.ca/feed/" rel="self" type="application/rss+xml" />
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description>The Narwhal’s team of investigative journalists dives deep to tell stories about the natural world in Canada you can’t find anywhere else.</description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Thu, 04 Jun 2026 06:46:36 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>EXCLUSIVE: Site C Dam ‘Devastating’ for British Columbians, Says Former CEO of BC Hydro</title>
      <link>https://thenarwhal.ca/exclusive-site-c-dam-devastating-british-columbians-says-former-ceo-bc-hydro/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2015/08/05/exclusive-site-c-dam-devastating-british-columbians-says-former-ceo-bc-hydro/</guid>
			<pubDate>Wed, 05 Aug 2015 16:27:38 +0000</pubDate>			
			<description><![CDATA[In an exclusive interview with DeSmog Canada, former BC Hydro CEO Marc Eliesen says ratepayers will face a &#8220;devastating&#8221; increase in their electricity bills if the Site C dam is built and emphasizes there is no rush to build new sources of power generation in B.C. &#8220;With Site C, BC Hydro ratepayers will be facing...]]></description>
			<content:encoded><![CDATA[<figure><img width="625" height="480" src="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4.jpg 625w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4-612x470.jpg 612w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4-450x346.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4-20x15.jpg 20w" sizes="(max-width: 625px) 100vw, 625px" /><figcaption><small><em></em></small></figcaption></figure> <p>In an exclusive interview with DeSmog Canada, former BC Hydro CEO Marc Eliesen says ratepayers will face a &ldquo;devastating&rdquo; increase in their electricity bills if the <a href="https://thenarwhal.ca/site-c-dam-bc"><strong>Site C dam</strong></a> is built and emphasizes there is no rush to build new sources of power generation in B.C.</p>
<p>&ldquo;With Site C, BC Hydro ratepayers will be facing a devastating increase of anywhere between 30 and 40 per cent over the next three years,&rdquo; Eliesen told DeSmog Canada in his first interview on the subject.</p>
<p>&ldquo;There&rsquo;s no rush. There&rsquo;s no immediate need for Site C or any other alternative energy,&rdquo; he said.</p>
<p>Eliesen&rsquo;s comment about the lack of immediate need for the power echoes statements made by Harry Swain, the chair of the panel that reviewed the Site C hydro dam for the provincial and federal governments. In March, <a href="https://thenarwhal.ca/2015/03/10/exclusive-b-c-government-should-have-deferred-site-c-dam-decision-chair-joint-review-panel">Swain told DeSmog Canada</a> the B.C. government should have held off on making a decision on the dam.</p>
<p><!--break--></p>
<p>With a price tag of $8.8 billion, the 1,100-megawatt <a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a> is the most expensive public project in B.C. history. The hydro dam, which would impact <a href="https://thenarwhal.ca/2014/09/02/field-dreams-peace-valley-farmers-ranchers-fight-keep-land-above-water-site-c-decision-looms">13,000 hectares of agricultural land</a>, has been proposed for the Peace River for three decades.</p>
<p>In late 2014, the provincial and federal governments approved the project and this July construction permits were issued despite pending court challenges by First Nations.</p>
<p>Eliesen, an economist by training, has also served as chairman and CEO of Ontario Hydro, chairman of Manitoba Hydro and has held senior roles with the federal government and the governments of Ontario and Manitoba. In November, Eliesen <a href="https://thenarwhal.ca/2014/11/03/energy-executive-quits-trans-mountain-pipeline-review-calls-NEB-process-public-deception">called the National Energy Board&rsquo;s review process</a> for the <a href="https://thenarwhal.ca/kinder-morgan-trans-mountain-pipeline">Kinder Morgan Trans Mountain pipeline</a> &ldquo;fraudulent&rdquo; and a &ldquo;public deception&rdquo; as he dropped out of the process.</p>
<p><img alt="Marc Eliesen" src="https://thenarwhal.ca/wp-content/uploads/files/marc-elieson-300.jpg"><strong>Failure to Consider Columbia River Power &lsquo;Non-Sensical&rsquo;</strong></p>
<p>Eliesen said there is no rush to build new generating capacity in B.C., leaving &ldquo;more than sufficient time to evaluate alternatives&rdquo; that are more cost effective and minimize environmental impacts.</p>
<p>The alternatives include everything from geothermal to BC Hydro&rsquo;s Burrard Thermal plant &mdash; due to be decommissioned in 2016 &mdash; to the 1,100 megawatts of electricity B.C. has access to through the <a href="https://thenarwhal.ca/2015/05/28/forgotten-electricity-could-delay-need-site-c-dam">Columbia River Treaty</a>, Eliesen said.</p>
<p>Not considering using the Columbia River power to meet B.C.&rsquo;s needs is &ldquo;non-sensical,&rdquo; Eliesen said. &nbsp;(See: <a href="https://thenarwhal.ca/2015/05/28/forgotten-electricity-could-delay-need-site-c-dam">The Forgotten Electricity that Could Eliminate Need for Site C Dam</a>)</p>
<p>&ldquo;If there is a demand for the power, well you clearly have an available supply, which you can depend on,&rdquo; he said.</p>
<p>&ldquo;If there was some massive escalation in demand that you needed immediately, well my goodness, you&rsquo;ve got two instant sources: there&rsquo;s 1,100 megawatts from the Columbia River and almost another 1,000 from the Burrard Thermal Plant, which was converted from coal to natural gas some time ago.&rdquo;</p>
<h3>
	<strong>Mining, LNG Companies Not Paying &lsquo;Fair Share&rsquo;</strong></h3>
<p>Eliesen also critiqued BC Hydro for adopting a price structure that results in everyday British Columbians subsidizing heavy power users.</p>
<p>&ldquo;Whether it&rsquo;s mining or proposed LNG plants or anything of that nature &hellip;&nbsp; They&rsquo;re all subsidized by other hydro ratepayers. Those heavy power users do not pay the true cost,&rdquo; Eliesen said. &ldquo;They are not paying their fair share.&rdquo;</p>
<p>The B.C. Utilities Commission used to review the cost of service, but that doesn&rsquo;t take place any more, Eliesen said.</p>
<p>&ldquo;The provincial government basically declared we don&rsquo;t want the commission &mdash; we don&rsquo;t want anyone &mdash; looking at BC Hydro plans. I think the result has been quite devastating.&rdquo;</p>
<p>The B.C. government exempted the Site C dam from a review by the B.C. Utilities Commission, despite calls from its own expert panel to refer the project for an independent review of costs and need. The province&rsquo;s failure to consider the panel&rsquo;s recommendations has since become the basis for the <a href="https://thenarwhal.ca/2014/10/29/peace-valley-landowners-take-b-c-government-court-over-site-c-dam-economics">Peace Valley Landowners Association court challenge</a> against the Site C dam.</p>
<p>Eliesen noted other jurisdictions are conducting much more thorough analyses of hydro projects, noting two projects in Manitoba he recently advised on.&nbsp;</p>
<p>&ldquo;They went through the most detailed evaluation by the Manitoba Public Utilities Board that ever could have taken place,&rdquo; Eliesen said. &ldquo;The kind of analysis and investigation and due diligence that was taken has never taken place recently in British Columbia.&rdquo;</p>
<h3>
	Site C Dam Price Tag Likely to Escalate</h3>
<p>In 1993, when Eliesen was the president and CEO of BC Hydro, he issued a public statement on behalf of the board stating that Site C would never be built because of its significant negative environmental, economic and social impacts.</p>
<p>That position quietly went by the wayside when the Gordon Campbell government was elected, Eliesen said, noting that electricity costs have increased at a far quicker rates than other jurisdictions since then.</p>
<p>Over the years, Eliesen has seen the cost of the Site C dam nearly double.&nbsp;</p>
<p>&ldquo;I&rsquo;ve seen the costs of Site C escalate enormously,&rdquo; he says. &ldquo;It used to be $5, $6 billion, then it was $7.9, now it&rsquo;s $8.8 billion. It&rsquo;ll easily reach, if it&rsquo;s ever built, in the $11 to $12 billion dollar range.&rdquo;</p>
<p>Eliesen says the costs of Site C haven&rsquo;t been adequately reviewed and there are &ldquo;too many conflicting interests in BC Hydro for it to undertake its own due diligence on this matter.&rdquo;</p>
<p>Calls for a moratorium on construction on Site C have gained strength recently with the Greater Vancouver Regional District and Peace River Regional District both calling on Premier Christy Clark to pause the project while active court cases are completed</p>
<p>On July 23, the <a href="http://www.bcgeu.bc.ca/BCGEU-stands-with-First-Nations-to-oppose-Site-C-dam" rel="noopener">B.C. Government and Service Employees&rsquo; Union announced</a> its opposition to the Site C dam due to its violation of indigenous rights and the massive loss of habitat and agricultural lands.</p>
<h3>
	<strong>Site C Dam &lsquo;Doesn&rsquo;t Make Any Sense&rsquo;</strong></h3>
<p>Despite the growing calls for a moratorium, the B.C. government appears hell-bent on pushing ahead with building the dam.</p>
<p>Asked why the government continues to push ahead, Eliesen said it doesn&rsquo;t make any sense.</p>
<p>&ldquo;Well I can&rsquo;t talk for the government, so I don&rsquo;t know, other than they want some major project undertaken during their current election term,&rdquo; he said.</p>
<p>&ldquo;It doesn&rsquo;t make sense in the context of environment, it doesn&rsquo;t make sense in the context of wanting to work with First Nations and it doesn&rsquo;t make sense, more specifically, on the economic impact because the B.C. ratepayer will pay enormously over the next three years.&rdquo;</p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Emma Gilchrist]]></dc:creator>
						<category domain="post_tag"><![CDATA[B.C. Government and Service Employees' Union]]></category><category domain="post_tag"><![CDATA[B.C. Utilities Commission]]></category><category domain="post_tag"><![CDATA[BC Hydro]]></category><category domain="post_tag"><![CDATA[BCGEU]]></category><category domain="post_tag"><![CDATA[BCUC]]></category><category domain="post_tag"><![CDATA[Burrard Thermal]]></category><category domain="post_tag"><![CDATA[Center Top]]></category><category domain="post_tag"><![CDATA[Columbia River Treaty]]></category><category domain="post_tag"><![CDATA[Fort St. John]]></category><category domain="post_tag"><![CDATA[Greater Vancouver Regional District]]></category><category domain="post_tag"><![CDATA[Harry Swain]]></category><category domain="post_tag"><![CDATA[Interview]]></category><category domain="post_tag"><![CDATA[Kinder Morgan]]></category><category domain="post_tag"><![CDATA[LNG]]></category><category domain="post_tag"><![CDATA[Manitoba Public Utilities Board]]></category><category domain="post_tag"><![CDATA[Marc Eliesen]]></category><category domain="post_tag"><![CDATA[mining]]></category><category domain="post_tag"><![CDATA[Peace River]]></category><category domain="post_tag"><![CDATA[Peace River Regional District]]></category><category domain="post_tag"><![CDATA[Peace Valley]]></category><category domain="post_tag"><![CDATA[Peace Valley Landowners Association]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[Site C dam]]></category><category domain="post_tag"><![CDATA[Trans Mountain Pipeline]]></category><category domain="post_tag"><![CDATA[Treaty 8]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4-612x470.jpg" fileSize="4096" type="image/jpeg" medium="image" width="612" height="470"><media:credit></media:credit></media:content><media:thumbnail url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-4-612x470.jpg" width="612" height="470" />    </item>
	    <item>
      <title>‘This is a Watershed Moment’: Chief Vows to Be Arrested As Fight Against Site C Dam Ramps Up</title>
      <link>https://thenarwhal.ca/watershed-moment-chief-vows-be-arrested-fight-against-site-c-dam-scales/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2015/07/12/watershed-moment-chief-vows-be-arrested-fight-against-site-c-dam-scales/</guid>
			<pubDate>Sun, 12 Jul 2015 22:45:07 +0000</pubDate>			
			<description><![CDATA[On the banks of the Peace River on Saturday, Grand Chief Stewart Phillip told hundreds of opponents to the Site C dam that he will be handcuffed if necessary to stop BC Hydro&#8217;s mega project from moving ahead.&#160; &#8220;From this point forward we have to really focus our efforts on how we&#8217;re going to physically...]]></description>
			<content:encoded><![CDATA[<figure><img width="640" height="336" src="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042.jpg 640w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042-300x158.jpg 300w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042-450x236.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042-20x11.jpg 20w" sizes="(max-width: 640px) 100vw, 640px" /><figcaption><small><em></em></small></figcaption></figure> <p>On the banks of the Peace River on Saturday, Grand Chief Stewart Phillip told hundreds of opponents to the <a href="https://thenarwhal.ca/site-c-dam-bc"><strong>Site C dam</strong></a> that he will be handcuffed if necessary to stop BC Hydro&rsquo;s mega project from moving ahead.&nbsp;</p>
<p>&ldquo;From this point forward we have to really focus our efforts on how we&rsquo;re going to physically stop this project from happening,&rdquo; Phillip said during a speech at the 10th annual Paddle for the Peace. &ldquo;The provincial cabinet recently <a href="https://thenarwhal.ca/2015/07/08/permits-start-construction-site-c-dam-issued-despite-pending-lawsuits">approved permits to allow construction</a> to begin. That&rsquo;s where the rubber is going to hit the road.&rdquo;</p>
<p>An emotional Phillip said B.C. is on the eve of an uprising after the government has repeatedly dealt in &ldquo;bad faith&rdquo; with First Nations.</p>
<p><!--break--></p>
<p><img alt="Grand Chief Stewart Phillip" src="https://thenarwhal.ca/wp-content/uploads/files/StewartPhillip.jpg"></p>
<p><em>Grand Chief Stewart Phillip has vowed to be arrested to stop the Site C Dam. </em></p>
<p>&ldquo;If push comes to shove, I for one &mdash; being a grandfather of 14 grandchildren who I absolutely adore &mdash; I am more than willing to be arrested as long as that will contribute to stopping this project,&rdquo; he said.</p>
<p>&ldquo;I know when that moment comes I will not be alone.&rdquo;</p>
<h3>
	<strong>The Last Paddle for the Peace? </strong></h3>
<p>About 300 boats took to the water Saturday in what could be the last Paddle for the Peace &mdash; held on a stretch of the Peace River that will be flooded if the $8.8 billion <a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a> is built.</p>
<p>Construction is due to start on the dam any day now despite a pending <a href="https://thenarwhal.ca/2015/06/25/starting-construction-site-c-dam-july-will-indefinitely-scar-b-c-s-relationships-first-nations-grand-chief">Treaty 8 legal challenge</a>, due to be heard by the federal Supreme Court on July 20.</p>
<p>&ldquo;This is a watershed moment in the province of British Columbia and in this country,&rdquo; Phillip said. &ldquo;We simply can not &mdash; we can not allow this to happen.&rdquo;</p>
<p><img alt="Beth Steiner" src="https://thenarwhal.ca/wp-content/uploads/files/BethSteiner.jpg"></p>
<p><em>Beth Steiner, 8, helps bag lettuce at her parents market garden stand in the Peace Valley. The land the Steiners grow everything from corn to watermelons on will be flooded if the Site C dam is built. </em></p>
<p>Calls for a moratorium on construction on Site C have gained strength recently with the Greater Vancouver Regional District board, representing 23 local governments and 2.5 million people, voting to ask Premier Christy Clark for a two-year moratorium on construction.</p>
<p>The Peace River Regional District &mdash; which includes <a href="https://thenarwhal.ca/2014/09/15/downside-boom-fort-st-john-worries-site-c-dam-will-put-strain-community">Fort St. John</a>, the city that would see the most economic activity from the dam &mdash; voted on Thursday to write a letter to Clark to request that all construction on Site C be stopped until active court cases regarding the project have been completed.</p>
<p>The B.C. government has been criticized for pushing ahead with the project while ignoring <a href="https://thenarwhal.ca/2015/03/10/exclusive-b-c-government-should-have-deferred-site-c-dam-decision-chair-joint-review-panel">repeated calls for an independent review of costs and demand</a> &mdash; a recommendation made by the government&rsquo;s own panel.</p>
<h3>
	<strong>David Suzuki: &lsquo;We Fundamentally Failed&rsquo;</strong></h3>
<p>Famed environmentalist David Suzuki changed his schedule to join the paddle on Saturday (and helped <a href="https://www.facebook.com/photo.php?fbid=10152795835392563&amp;set=a.54497767562.75283.636837562&amp;type=1&amp;theater" rel="noopener">rescue some capsized canoeists</a> while he was at it) because the fight for the Peace Valley is near and dear to his heart. During a keynote speech, he told the crowd about his involvement with stopping the Site C dam for the first time in 1981.</p>
<p>&ldquo;Thirty-five years later, guess what? We&rsquo;re fighting exactly the same battles all over again,&rdquo; Suzuki told the crowd. &ldquo;What we thought were victories were not victories at all, because we fundamentally failed. We failed to shift the way we see our place on the planet.&rdquo;</p>
<p>Ranchers Dick and Renee Ardill know the drain of the 34-year fight against the dam all too well. When the dam was first defeated, Dick was a spry 54-year-old. Now he&rsquo;s 88 and grasps his truck for balance as he walks.</p>
<p><img alt="Dick Ardill" src="https://thenarwhal.ca/wp-content/uploads/files/DickArdill.jpg"></p>
<p><em>Dick Ardill has spent his 88 years ranching in the Peace Valley. His parents homesteaded the land in 1910. </em></p>
<p>His daughter Renee is sick of telling <a href="https://thenarwhal.ca/2014/09/02/field-dreams-peace-valley-farmers-ranchers-fight-keep-land-above-water-site-c-decision-looms">their story</a>.</p>
<p>&ldquo;I&rsquo;m tired of the whole thing,&rdquo; she told DeSmog Canada during a break from baling hay. &ldquo;I&rsquo;m tired of the stupidity of it.&rdquo;</p>
<p>&ldquo;You have to just keep going on and doing your job and, if we lose and they build the thing, we&rsquo;ll worry about that when the time comes. In the meantime, I&rsquo;m hoping that someone comes to their senses.&rdquo;</p>
<p>While the recent rejection of the Peace Valley Landowners Association legal challenge was disappointing, it&rsquo;s not the end of the world, Renee says.</p>
<p>&ldquo;The battle goes on.&rdquo;</p>
<h3>
	<strong>Injunctions Will Be Filed to Stop Site C Dam Construction</strong></h3>
<p>&ldquo;This is the tenth year we&rsquo;ve done this and if BC Hydro and B.C. have their way we won&rsquo;t be doing it any more,&rdquo; said Roland Willson, chief of West Moberly First Nation, before canoes were put in the water.</p>
<p><img alt="Roland Willson" src="https://thenarwhal.ca/wp-content/uploads/files/RolandWillson.jpg"></p>
<p><em>West Moberly Chief Roland Willson. </em></p>
<p>In an interview with DeSmog Canada, Willson said he&rsquo;s holding out for the courts to make the right decision.</p>
<p>&ldquo;The dam is a direct infringement of our treaty rights,&rdquo; he said.</p>
<p>Willson said injunctions will be filed to stop any construction that will cause &ldquo;irreparable harm.&rdquo;</p>
<p>Farmer Ken Boon, who hosts the Paddle for the Peace on his land, says the early construction plans look like a soft start.</p>
<p>&ldquo;I&rsquo;m still confident this dam will not be built,&rdquo; Boon said. &ldquo;All we&rsquo;ve got to do is win one court case.&rdquo;</p>
<p><img alt="Ken Boon" src="https://thenarwhal.ca/wp-content/uploads/files/KenBoon.jpg"></p>
<p><em>Ken Boon is confident the Site C dam will not be built. </em></p>
<p>Boon&rsquo;s land will be flooded if the dam is built, but he has yet to be approached by BC Hydro about moving.</p>
<p>&ldquo;I&rsquo;m pretty sure they&rsquo;re expecting a lot of these to go to expropriation if things carry on,&rdquo; he said.</p>
<p>As it stands, Boon and his wife Arlene still aren&rsquo;t thinking about moving.</p>
<h3>
	<strong>&lsquo;We&rsquo;re Being Mowed Over&rsquo;</strong></h3>
<p>Shawna-Marie Phillips is less optimistic. If construction moves forward, a 3,000-man camp will be located one kilometre from her organic farm and ranch.</p>
<p>Sometimes it feels like she&rsquo;s yelling into the void and nobody&rsquo;s listening, she said.</p>
<p>Given that the Site C dam is the most expensive public project in B.C. history, yet only one reporter from a major news outlet attended Saturday&rsquo;s event, Phillips could be forgiven for feeling out of sight and out of mind.</p>
<p>&ldquo;I feel like we&rsquo;re being mowed over,&rdquo; she said. &nbsp;&ldquo;I get a feeling that this is the last time.&rdquo;</p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Emma Gilchrist]]></dc:creator>
			<category domain="post_cat"><![CDATA[In-Depth]]></category>			<category domain="post_tag"><![CDATA[Arlene Boon]]></category><category domain="post_tag"><![CDATA[BC Hydro]]></category><category domain="post_tag"><![CDATA[Bear Flats]]></category><category domain="post_tag"><![CDATA[Caleb Behn]]></category><category domain="post_tag"><![CDATA[Center Top]]></category><category domain="post_tag"><![CDATA[Christy Clark]]></category><category domain="post_tag"><![CDATA[David Suzuki]]></category><category domain="post_tag"><![CDATA[Dick Ardill]]></category><category domain="post_tag"><![CDATA[Fort St. John]]></category><category domain="post_tag"><![CDATA[Grand Chief Stewart Phillip]]></category><category domain="post_tag"><![CDATA[Greater Vancouver Regional District]]></category><category domain="post_tag"><![CDATA[In-Depth]]></category><category domain="post_tag"><![CDATA[Ken Boon]]></category><category domain="post_tag"><![CDATA[Natural Resources]]></category><category domain="post_tag"><![CDATA[Peace River]]></category><category domain="post_tag"><![CDATA[Peace River Regional District]]></category><category domain="post_tag"><![CDATA[Renee Ardill]]></category><category domain="post_tag"><![CDATA[Roland Willson]]></category><category domain="post_tag"><![CDATA[Shawna-Marie Phillips]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[Site C dam]]></category><category domain="post_tag"><![CDATA[Stewart Phillip]]></category><category domain="post_tag"><![CDATA[Treaty 8]]></category><category domain="post_tag"><![CDATA[West Moberly]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042-300x158.jpg" fileSize="4096" type="image/jpeg" medium="image" width="300" height="158"><media:credit></media:credit></media:content><media:thumbnail url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_1042-300x158.jpg" width="300" height="158" />    </item>
	    <item>
      <title>Permits to Start Construction on Site C Dam Issued Despite Pending Lawsuits</title>
      <link>https://thenarwhal.ca/permits-start-construction-site-c-dam-issued-despite-pending-lawsuits/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2015/07/08/permits-start-construction-site-c-dam-issued-despite-pending-lawsuits/</guid>
			<pubDate>Wed, 08 Jul 2015 16:41:27 +0000</pubDate>			
			<description><![CDATA[Authorizations allowing construction to begin immediately on the Site C dam on the Peace River in northeastern B.C. were issued on Tuesday by B.C.&#8217;s Ministry of Forests, Lands and Natural Resource Operations &#8212; despite a pending legal challenge by the Treaty 8 First Nations. This Saturday, hundreds of people in canoes and kayaks will paddle...]]></description>
			<content:encoded><![CDATA[<figure><img width="640" height="480" src="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364.jpg 640w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364-627x470.jpg 627w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364-450x338.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364-20x15.jpg 20w" sizes="(max-width: 640px) 100vw, 640px" /><figcaption><small><em></em></small></figcaption></figure> <p>Authorizations allowing construction to begin immediately on the <strong><a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a></strong> on the Peace River in northeastern B.C. were <a href="https://news.gov.bc.ca/stories/decisions-made-on-site-c-permit-applications" rel="noopener">issued on Tuesday</a> by B.C.&rsquo;s Ministry of Forests, Lands and Natural Resource Operations &mdash; despite a pending legal challenge by the Treaty 8 First Nations.</p>
<p>This Saturday, hundreds of people in canoes and kayaks will paddle down the Peace River to protest the imminent construction of the dam and flooding of the river.</p>
<p>The $8.8 billion <a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a> &mdash; the most expensive public project in B.C. history &mdash; was approved by the B.C. government in December. If built, the dam will flood more than 100 kilometres of the Peace River and its tributaries, drowning agricultural land that experts say could <a href="https://thenarwhal.ca/2014/09/02/field-dreams-peace-valley-farmers-ranchers-fight-keep-land-above-water-site-c-decision-looms">produce fruit and vegetables for one million people</a>.</p>
<p>Since the government&rsquo;s decision to move forward with the project, expert voices have come out of the woodwork to speak out against the project.</p>
<p><!--break--></p>
<p>Last week, the Greater Vancouver Regional District Board, representing 23 local governments and 2.5 million people, voted to ask Premier Christy Clark for a two-year moratorium on Site C. The board joins more than 30 other B.C. municipalities calling for a moratorium on the project.</p>
<p>&ldquo;This permitting decision shows the provincial government&rsquo;s disdain for B.C. ratepayers,&rdquo; said Rob Botterell, &nbsp;general counsel to the Peace Valley Landowner Association. &nbsp;&ldquo;BC Hydro&rsquo;s own analysis shows that a two-year delay will save B.C. ratepayers about $200 million.&nbsp; Who benefits from the urgency to construct Site C? Certainly not those of us paying the tab."</p>
<h3>
	Dam Construction Will 'Indefinitely Scar' B.C.'s Relationship with First Nations</h3>
<p>The First Nations Leadership Council recently said moving forward with the dam before the Treaty 8 legal challenge has been heard on July 20th will <a href="https://thenarwhal.ca/2015/06/25/starting-construction-site-c-dam-july-will-indefinitely-scar-b-c-s-relationships-first-nations-grand-chief">&ldquo;indefinitely scar&rdquo; B.C.&rsquo;s relationship with First Nations</a>.</p>
<p>This spring, energy economist Robert McCullough said that BC Hydro has dramatically underestimated the cost of producing power from Site C and that far cheaper energy alternatives are available.</p>
<p>Harry Swain, chair of the panel that examined Site C for the federal and provincial governments, has called the failure of the B.C. government to investigate alternatives to the dam a <a href="https://thenarwhal.ca/2015/03/11/dereliction-duty-chair-site-c-panel-b-c-s-failure-investigate-alternatives-mega-dam">&ldquo;dereliction of duty.&rdquo;</a> His criticism of the B.C. government's actions was called <a href="https://thenarwhal.ca/2015/03/11/dereliction-duty-chair-site-c-panel-b-c-s-failure-investigate-alternatives-mega-dam">&ldquo;unprecedented&rdquo;</a> by&nbsp;environmental&nbsp;law&nbsp;experts.</p>
<p>The cost of renewable alternatives have plummeted in cost in recent years and Site C&rsquo;s business case assumptions are two to five years out of date. The Canadian Geothermal Energy Association says geothermal can meet all of B.C.'s future energy needs at a lower cost than Site C with fewer environmental impacts.</p>
<p>Despite growing opposition from experts, <a href="https://www.bchydro.com/news/press_centre/news_releases/2015/site-c-poll.html" rel="noopener">BC Hydro released polling</a> on Tuesday indicating that support for the dam has increased amongst British Columbians.</p>
<p>The Abacus Data poll shows 59 per cent of those polled support building the Site C dam, while 22 per cent support the dam under certain circumstances. Seventeen per cent are opposed. Province-wide awareness of the Site C dam has increased significantly: 75 per cent of British Columbians surveyed are aware of Site C now, compared to 41 per cent in 2013.</p>
<p>The B.C. government says Site C will provide approximately 10,000 direct jobs during construction and will generate enough electricity to power about 450,000 homes per year.</p>
<p>However, the panel that reviewed BC Hydro&rsquo;s application to build the dam found <a href="https://thenarwhal.ca/2014/05/27/7-9-billion-dollar-question-is-site-c-dam-electricity-destined-lng-industry">demand for the power had not been proven</a> on the timeline provided and called for an independent review of costs by the B.C. Utilities Commission &mdash; a call the B.C. government has ignored.</p>
<p>Early indications are that some of <a href="https://thenarwhal.ca/2015/06/12/it-s-official-site-c-dam-could-power-fracking-operations-northeast-b-c">Site C&rsquo;s power will be used to power natural gas operations in northeast B.C.</a> For at least the first four years, demand for the power will be insufficient so a portion will be exported at a projected loss of $800 million.</p>
<p><em>Photo: This section of the Peace River will be flooded if the Site C dam is built. </em></p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Emma Gilchrist]]></dc:creator>
						<category domain="post_tag"><![CDATA[Abacus Data]]></category><category domain="post_tag"><![CDATA[B.C. Utilities Commission]]></category><category domain="post_tag"><![CDATA[BC Hydro]]></category><category domain="post_tag"><![CDATA[Christy Clark]]></category><category domain="post_tag"><![CDATA[First Nations Leadership Council]]></category><category domain="post_tag"><![CDATA[Fort St. John]]></category><category domain="post_tag"><![CDATA[fracking]]></category><category domain="post_tag"><![CDATA[Greater Vancouver Regional District]]></category><category domain="post_tag"><![CDATA[Harry Swain]]></category><category domain="post_tag"><![CDATA[Lands and Natural Resoure Operations]]></category><category domain="post_tag"><![CDATA[Ministry of Forests]]></category><category domain="post_tag"><![CDATA[natural gas]]></category><category domain="post_tag"><![CDATA[Paddle for the Peace]]></category><category domain="post_tag"><![CDATA[Peace River]]></category><category domain="post_tag"><![CDATA[Peace Valley Landowner Association]]></category><category domain="post_tag"><![CDATA[PVLA]]></category><category domain="post_tag"><![CDATA[Rob Botterrell]]></category><category domain="post_tag"><![CDATA[Robert McCullough]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[Site C dam]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364-627x470.jpg" fileSize="4096" type="image/jpeg" medium="image" width="627" height="470"><media:credit></media:credit></media:content><media:thumbnail url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0364-627x470.jpg" width="627" height="470" />    </item>
	</channel>
</rss>