
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description><![CDATA[Deep Dives, Cold Facts, &#38; Pointed Commentary]]></description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Wed, 06 May 2026 11:08:45 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>Pipeline Regulator Orders High-Pressure Safety Test of Enbridge’s Line 9B</title>
      <link>https://thenarwhal.ca/pipeline-regulator-orders-high-pressure-safety-test-enbridge-s-line-9b/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2015/06/19/pipeline-regulator-orders-high-pressure-safety-test-enbridge-s-line-9b/</guid>
			<pubDate>Fri, 19 Jun 2015 20:49:22 +0000</pubDate>			
			<description><![CDATA[The National Energy Board (NEB) ordered high-pressure testing of a segment of Enbridge&#8217;s Line 9 pipeline before the line, a west-to-east oil pipeline, can begin operating according to a press release issued Thursday. &#8220;Before Line 9B becomes operational, hydrostatic testing results of three segments of the pipeline must be provided to and approved by the...]]></description>
			<content:encoded><![CDATA[<figure><img width="640" height="480" src="https://thenarwhal.ca/wp-content/uploads/2018/04/National-Energy-Board-Building.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/National-Energy-Board-Building.jpg 640w, https://thenarwhal.ca/wp-content/uploads/2018/04/National-Energy-Board-Building-627x470.jpg 627w, https://thenarwhal.ca/wp-content/uploads/2018/04/National-Energy-Board-Building-450x338.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/National-Energy-Board-Building-20x15.jpg 20w" sizes="(max-width: 640px) 100vw, 640px" /><figcaption><small><em></em></small></figcaption><hr></figure><p>The National Energy Board (NEB) ordered high-pressure testing of a segment of Enbridge&rsquo;s Line 9 pipeline before the line, a west-to-east oil pipeline, can begin operating according to a <a href="http://news.gc.ca/web/article-en.do?mthd=tp&amp;crtr.page=1&amp;nid=988529&amp;crtr.tp1D=1" rel="noopener">press release</a> issued Thursday.<p>&ldquo;Before Line 9B becomes operational, hydrostatic testing results of three segments of the pipeline must be provided to and approved by the NEB,&rdquo; the National Energy Board &mdash; Canada&rsquo;s federal pipeline regulator &mdash; said.</p><p>Enbridge requested permission to reverse the flow of a 639-kilometre portion of the Line 9B pipeline between North Westover, Ontario and Montreal. Line 9B is part of the larger Line 9, which Enbridge hopes will carry diluted bitumen from the Alberta oilsands to Eastern Canada.</p><p>Community groups, <a href="https://thenarwhal.ca/2015/05/27/groups-want-pipeline-regulator-explain-wont-order-safety-test-enbridge-line-9">particularly in Quebec</a>, have long requested the high-pressure, hydrostatic test. A hydrotest or hydrostatic test is a commonly used method of determining if a pipeline can operate safely at its expected operating pressure. Recently a number of groups demanded the NEB explain why it would not order a hydrotest of Line 9.</p><p><!--break--></p><p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/Enbridge%20Line%209%20map.png"></p><p><em>Map of Enbridge's Line 9.</em></p><p>The NEB&rsquo;s recent announcement appears to be in response to public concern.</p><p>&ldquo;Line 9B is located in a heavily urbanized area with a large number of waterways; any released would travel rapidly to the water systems and affect a large number of people,&rdquo; the NEB press release stated. &ldquo;A higher degree of confidence in the integrity, or condition, of the pipeline is required to show that the pipeline is safe to operate.&rdquo;</p><p>The public has expressed concern over the age of the pipeline, its out-of-date design features and the possible effects of transporting diluted oilsands (also called tarsands) bitumen on the pipeline&rsquo;s integrity.</p><p>The entire pipeline will not be hydrostatically tested. Three small sections of the pipeline have been selected for testing by the NEB. In Ontario, the sections between Kingston and Brockville and around Hilton will be tested. One section in Mirabel, Quebec near Montreal will also undergo a hydrotest.&nbsp;</p><p>Little detail is given as to why these three sections were chosen for the safety test.</p><p>&ldquo;The number and location of the segments to be tested were identified by NEB professional engineers to provide the best results to validate existing data. The learnings gained will be applied, as appropriate, to the entire pipeline,&rdquo; the NEB stated.</p><p>The NEB also gave the go-ahead or <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2432299/2789379/Order_OPSO%2DE101%2D011%2D2015_to_Enbridge_Pipelines_Inc._%2D_A4Q6Z1.pdf?nodeid=2789291&amp;vernum=-2" rel="noopener">&ldquo;leave to open&rdquo;</a> for the 39-year old pipeline to begin pumping oil to Montreal via southern Ontario. Enbridge must comply with the regulator&rsquo;s conditions first.</p><p>&ldquo;Enbridge is granted leave to open the North Westover &lsquo;B&rsquo;, Hilton &lsquo;A&rsquo;, Cardinal &lsquo;A&rsquo; and Montreal &lsquo;A&rsquo; facilities for the transmission of crude oil,&rdquo; states an NEB regulatory order dated June 18th. The &ldquo;facilities&rdquo; are the pipeline&rsquo;s pumping stations. &nbsp;</p><p><strong>First Nation Requests Delay While Line 9 Legal Challenge Underway</strong></p><p>If Enbridge meets the board&rsquo;s conditions, the Calgary-based pipeline company is free to put Line 9 back into operation despite an unresolved First Nation legal challenge against the project.&nbsp; The Chippewas of the Thames or Deshkaan Ziibing in the Anishinaabe language had their first day in federal court this week.</p><p>"Canada has never consulted us on this project and it's their constitutional obligation to do so. They can't appoint a third party. It should be a nation-to-nation discussion," Myeengun Henry, Deshkaan Ziibing band councilor, told VICE.&nbsp;</p><p>The southwestern Ontario First Nation argues in their case before the Federal Court of Appeal the Line 9 project could negatively impact their constitutionally protected aboriginal and treaty rights. The federal government has the legal duty to consult with First Nations, Metis, and Inuit when projects may infringe upon their rights.</p><p>No consultations between the federal government and any of the First Nations along Line 9 have taken place to date.</p><p>Deshkaan Ziibing asked the NEB earlier this month to delay Line 9&rsquo;s start up until their legal challenge had reached its conclusion.</p><p>&ldquo;Chippewa of the Thames First Nation is requesting they be granted a stay until after the issue is heard in court. If the NEB moves forward before the legal questions are settled, the legal process will hold no validity and the chance to properly consult and accommodate will be lost forever,&rdquo; <a href="http://www.tbnewswatch.com/news/371884/Respect_legal_process_and_hold_off_on_opening_Line_9:_Ontario_Regional_Chief_" rel="noopener">Ontario Regional Chief Stan Beardy</a> said in defense of Deshkaan Ziibing&rsquo;s request.</p><p>&ldquo;The NEB can grant the stay order and avoid causing irreparable harm.&rdquo;</p></p>
<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Derek Leahy]]></dc:creator>
						<category domain="post_tag"><![CDATA[diluted bitumen]]></category><category domain="post_tag"><![CDATA[Enbridge]]></category><category domain="post_tag"><![CDATA[hydrostatic test]]></category><category domain="post_tag"><![CDATA[line 9]]></category><category domain="post_tag"><![CDATA[national energy board]]></category><category domain="post_tag"><![CDATA[NEB]]></category><category domain="post_tag"><![CDATA[oilsands]]></category><category domain="post_tag"><![CDATA[Ontario]]></category><category domain="post_tag"><![CDATA[pipelines]]></category><category domain="post_tag"><![CDATA[tar sands]]></category>    </item>
	    <item>
      <title>Montreal Wants to Examine Safety of Line 9 With Hydrostatic Test</title>
      <link>https://thenarwhal.ca/montreal-renews-call-hydrostatic-safety-test-line-9/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2015/05/07/montreal-renews-call-hydrostatic-safety-test-line-9/</guid>
			<pubDate>Thu, 07 May 2015 16:05:04 +0000</pubDate>			
			<description><![CDATA[A Quebec citizen group is applauding a resolution by the Greater Montreal Area&#8217;s governing body asking the National Energy Board for a hydrostatic safety test of the Line 9 oil pipeline before it goes back into operation this summer. &#8220;We would like to thank the CMM (Greater Montreal Area) and its president, Montreal Mayor Denis...]]></description>
			<content:encoded><![CDATA[<figure><img width="640" height="360" src="https://thenarwhal.ca/wp-content/uploads/2018/04/141709553.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/141709553.jpg 640w, https://thenarwhal.ca/wp-content/uploads/2018/04/141709553-300x169.jpg 300w, https://thenarwhal.ca/wp-content/uploads/2018/04/141709553-450x253.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/141709553-20x11.jpg 20w" sizes="(max-width: 640px) 100vw, 640px" /><figcaption><small><em></em></small></figcaption><hr></figure><p>A Quebec citizen group is applauding a resolution by the Greater Montreal Area&rsquo;s governing body asking the National Energy Board for a hydrostatic safety test of the Line 9 oil pipeline before it goes back into operation this summer.<p>&ldquo;We would like to thank the CMM (Greater Montreal Area) and its president, Montreal Mayor Denis Coderre, as well as the numerous other elected bodies that have listened to the concerns of the public, and acted swiftly on this safety issue by adopting similar resolutions and forwarding them to the NEB,&rdquo; Lorraine Caron, a spokesperson for the citizen group <a href="https://twitter.com/citoyenscourant" rel="noopener">Les Citoyens au Courant</a>, said.</p><p>The governing body, better known as the <a href="http://cmm.qc.ca/fr/accueil/" rel="noopener">Communaut&eacute; m&eacute;tropolitaine de Montr&eacute;al</a> or Montreal Metropolitan Community, passed the resolution in a meeting on April 30. Line 9, a 39-year old Enbridge pipeline, runs through a densely populated corridor from Montreal, through Toronto and on to Sarnia in southwestern Ontario.</p><p>Citizen groups, and environmental organizations in Ontario and Quebec have been <a href="https://thenarwhal.ca/2014/03/13/public-request-line-9-safety-test-denied-neb-pipeline-approval">voicing concerns for over two years </a>on whether Line 9 &mdash; the twin in age and design of the Enbridge pipeline that ruptured in Kalamazoo, Michigan in 2010 &mdash; can operate safely at an increased capacity and while transporting oilsands (also called tar sands) bitumen.</p><p><!--break--></p><p>&ldquo;We have been convinced by industry experts, including Richard Kuprewicz, U.S. expert on pipeline safety, that hydrostatic testing is the only way to guarantee the 639-kilometre pipeline can withstand the pressure it will be subjected to and the only way to find pinhole leaks and some types of stress corrosion cracking that could lead to rupture,&rdquo; Katherine Massam of Les Citoyens au Courant stated in a press release.</p><p>Kuprewicz, who discussed Line 9 with DeSmog Canada on several occasions, believes without a hydrotest <a href="https://thenarwhal.ca/2013/10/21/pipeline-expert-90-percent-probability-line-9-rupture-dilbit">there is a 90 per cent probability the pipeline will rupture</a>. The U.S.-based pipeline safety expert with over thirty years of experience found evidence of extensive stress corrosion cracking on the pipeline when examining Enbridge&rsquo;s own documents on Line 9's condition. &nbsp;</p><p>&ldquo;Enbridge needs to conduct a hydrostatic test on Line 9. It is the gold standard for pipeline integrity and safety. Canada has a well-established history of hydrotesting its pipelines,&rdquo; Kuprewicz told DeSmog&nbsp;Canada in a 2013 interview.</p><p>A hydrostatic test or hydrotest would pump water through Line 9 at similar pressures to those the pipeline is expected to operate at. The test could provide valuable information on whether Line 9 can operate safely at its proposed maximum pressure.</p><h3>
	<strong>The NEB Can Order A Hydrotest of Line 9</strong></h3><p>When the National Energy Board (NEB), Canada&rsquo;s federal pipeline regulator, approved Enbridge&rsquo;s proposed changes to Line 9 &mdash; a 20 per cent increase in capacity, flow reversal, and the shipping of heavy crudes like bitumen &mdash; in March 2014, <a href="https://thenarwhal.ca/2014/03/13/public-request-line-9-safety-test-denied-neb-pipeline-approval">the board reserved the right to order a hydrotest</a> if Enbridge&rsquo;s updated Line 9 engineering assessment was deemed unsatisfactory.</p><p>So far, the NEB has chosen not to exercise this right.</p><p>&ldquo;Our municipal officials have done their job by asking for these tests. Now we are expecting the Quebec government to do the same by following recommendations that CAPERN made in 2013, especially the one that pertains to carrying out hydrostatic tests to verify the pipeline,&rdquo; Caron said.&nbsp;</p><p>A committee commissioned by the Quebec government to investigate the Line 9 project in 2013 recommended Quebec request a hydrotest to ensure the pipeline would not fail.</p><p>During the Line 9 regulatory hearings in 2013, the province of <a href="https://thenarwhal.ca/2014/01/07/ontario-must-stands-its-ground-line-9">Ontario also asked the NEB to conduct a hydrostatic test</a> of the pipeline. &nbsp;&nbsp;</p><h3>
	<strong>Line 9 Approved, But Still Contested</strong></h3><p>Line 9 may have regulatory approval, but the project&rsquo;s opponents in Ontario and Quebec certainly have not given up yet.</p><p>In a 29 &ndash; 2 decision, Toronto City Council passed a motion last April requesting the NEB not allow Enbridge to re-start Line 9 until the company installs automatic shut off valves on the pipeline at all major water crossings, the source of the city&rsquo;s drinking water. Council deemed the valves necessary to halt the flow of oil through the pipeline in the event of a spill.</p><p>&ldquo;This motion reflects increased resident pressure on the city to defend us all against environmental hazards,&rdquo; Jessica Lyons, a member of the Toronto No Line 9 Network, said in a <a href="http://toronto.mediacoop.ca/story/toronto-council-moves-protect-city%E2%80%99s-water-pipelin/33346" rel="noopener">Toronto Media Co-op article</a>. &nbsp;</p><p>	The Chippewas of the Thames, an Anishinaabe First Nation in southwestern Ontario, <a href="http://you.leadnow.ca/petitions/demand-the-neb-respect-indigenous-rights-sign-to-support-chippewas-of-the-thames-first-nation?bucket&amp;source=facebook-share-button&amp;time=1430877302" rel="noopener">will appear in federal court this June to challenge Line 9 </a>on the grounds the project violates their constitutionally protected aboriginal and treaty rights. &nbsp;</p><p>&ldquo;All eyes are on Energy East, but we are in the 9th inning with Line 9 right now,&rdquo; Caron told DeSmog Canada.</p><p>&ldquo;If Line 9 is allowed to transport tar sands oil it will set a bad precedent for all the other pipeline projects.&rdquo;</p><p>Line 9 is expected to begin operating again at the end of June.</p><p><em>Image Credit: Oil Change International</em></p></p>
<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Derek Leahy]]></dc:creator>
						<category domain="post_tag"><![CDATA[bitumen]]></category><category domain="post_tag"><![CDATA[crude oil]]></category><category domain="post_tag"><![CDATA[Denis Coderre]]></category><category domain="post_tag"><![CDATA[Enbridge]]></category><category domain="post_tag"><![CDATA[Enbridge Line 9]]></category><category domain="post_tag"><![CDATA[hydrostatic test]]></category><category domain="post_tag"><![CDATA[hydrotest]]></category><category domain="post_tag"><![CDATA[Kalamazoo Spill]]></category><category domain="post_tag"><![CDATA[Les Citoyens au Courant]]></category><category domain="post_tag"><![CDATA[Line 6B]]></category><category domain="post_tag"><![CDATA[montreal]]></category><category domain="post_tag"><![CDATA[oilsands]]></category><category domain="post_tag"><![CDATA[pipeline spill]]></category><category domain="post_tag"><![CDATA[pipelines]]></category><category domain="post_tag"><![CDATA[Richard Kuprewicz]]></category><category domain="post_tag"><![CDATA[tarsands]]></category>    </item>
	    <item>
      <title>Public Requests for Basic Line 9 Safety Test Denied in NEB Pipeline Approval</title>
      <link>https://thenarwhal.ca/public-request-line-9-safety-test-denied-neb-pipeline-approval/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2014/03/17/public-request-line-9-safety-test-denied-neb-pipeline-approval/</guid>
			<pubDate>Mon, 17 Mar 2014 17:04:20 +0000</pubDate>			
			<description><![CDATA[Last week&#8217;s approval of the Line 9 pipeline project by the National Energy Board (NEB) hinges on thirty conditions being met by the pipeline&#8217;s operator, Enbridge. The conditions are meant to enhance the safety of the project that involves shipping 300,000 barrels of crude oil and oilsands bitumen everyday from Sarnia to Montreal. Critics of...]]></description>
			<content:encoded><![CDATA[<figure><img width="395" height="327" src="https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-03-17-at-10.07.57-AM.png" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-03-17-at-10.07.57-AM.png 395w, https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-03-17-at-10.07.57-AM-300x248.png 300w, https://thenarwhal.ca/wp-content/uploads/2018/04/Screen-Shot-2014-03-17-at-10.07.57-AM-20x17.png 20w" sizes="(max-width: 395px) 100vw, 395px" /><figcaption><small><em></em></small></figcaption><hr></figure><p>Last week&rsquo;s approval of the Line 9 pipeline project by the National Energy Board (NEB) hinges on thirty conditions being met by the pipeline&rsquo;s operator, Enbridge. The conditions are meant to enhance the safety of the project that involves shipping 300,000 barrels of crude oil and oilsands bitumen everyday from Sarnia to Montreal. Critics of the project say the requirements are not <a href="http://www.vancouverobserver.com/news/national-energy-board-approves-enbridge-line-9-expansion-project" rel="noopener">&ldquo;meaningful conditions&rdquo;</a> and <a href="https://thenarwhal.ca/2014/03/06/enbridge-line-9-bitumen-pipeline-approved-weak-conditions">do not protect communities</a> living along the 38-year old pipeline.<p>"By giving the green light without actually imposing conditions, the NEB is complacent towards the oilsands industry and demonstrates its inability to protect [our] health, public safety and our environment," Sidney Ribaux, executive director of <a href="http://www.equiterre.org/communique/loffice-national-de-lenergie-complice-de-lindustrie-des-sables-bitumineux-au-detriment-de" rel="noopener">&Eacute;quiterre</a>, says of Line 9&rsquo;s approval in a statement from Montreal.</p><p>&ldquo;The NEB may pretend to have put adequate safeguards in place but it has only safeguarded the profits of pipeline companies and externalized the risks associated with pipelines onto landowners as the Board always does,&rdquo; says Dave Core, president of the Canadian Association of Energy Pipeline Landowners Associations (<a href="http://www.landownerassociation.ca" rel="noopener">CAEPLA</a>).</p><p>The conditions largely require Enbridge to provide the NEB &ndash; Canada&rsquo;s independent energy regulator &ndash; with the most recent information about the Line 9 project. This includes information regarding the current state of the pipeline, revised emergency response plans and the pipeline company&rsquo;s updated pipeline leak detection system manual.</p><p><!--break--></p><p>Why this information was not required before the NEB decided the Line 9 project was in &ldquo;the public&rsquo;s interest&rdquo; has baffled critics. The <a href="https://thenarwhal.ca/2013/04/15/pipeline-deadline-rushed-review-process-tar-sands-line-9-stifles-public-participation">difficulties of participating</a> in the eighteen-month decision-making process frustrated participants who were unable to review and comment on the most recent and relevant information about the project.</p><p>&ldquo;The decision and its conditions do not reflect the concerns raised by the public about Line 9 and shipping tar sands bitumen through their communities,&rdquo; Adam Scott, climate and energy program manager for <a href="http://environmentaldefence.ca" rel="noopener">Environmental Defence Canada</a> told DeSmog.</p><p><strong>Public&rsquo;s Concerns Absent from Decision</strong></p><p>Scott points to a hydrostatic test of Line 9 as the one condition the governments of Ontario and Quebec, environmental groups, and landowners asked for, but the Board chose not to impose:</p><p>&ldquo;The Board elects to make no order at this time regarding hydrotesting of the pre-existing portions of Line 9,&rdquo; reads page 49 of the NEB&rsquo;s <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2431831/2428616/Reasons_for_Decision_OH%2D002%2D2013_%2D_A3V1E4.pdf?nodeid=2431830&amp;vernum=-2" rel="noopener">140-page document</a> on the Line 9 decision.</p><p>A hydrostatic test or hydrotest involves flushing a pipeline with high-pressure water to determine if it can safely operate at maximum pressure.</p><p>Line 9 has&nbsp;<a href="http://durhamclear.ca/taxonomy/term/32" rel="noopener">not operated at its maximum pressure</a>&nbsp;in recent years. Evidence submitted to the NEB by an international <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/956564/956632/981386/C13%2D6%2D3_%2D_Attachment_B%2D_ACCUFACTS_PIPELINE_SAFETY_REPORT%2E2013%2E08.05_%2D_A3J7T4.pdf?nodeid=981150&amp;vernum=-2" rel="noopener">pipeline safety expert</a> indicated the best way to ensure the existing cracks on Line 9 do not turn into a rupture is to conduct a hydrotest.</p><p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/Line9snake.jpg"></p><p><em>Protests London, Ontario against Line 9's approval&nbsp;</em></p><p>&ldquo;Enbridge needs to conduct a hydrostatic test on Line 9. It is the gold standard for pipeline integrity and safety. Canada has a well-established history of hydrotesting its pipelines,&rdquo; Richard Kuprewicz, pipeline safety expert told DeSmog Canada in an <a href="https://thenarwhal.ca/2013/10/21/pipeline-expert-90-percent-probability-line-9-rupture-dilbit">interview</a> last October.</p><p>The Board did not disagree with the argument for a hydrotest, but appears to have sided with Enbridge&rsquo;s view the test could have <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2431831/2428616/Reasons_for_Decision_OH%2D002%2D2013_%2D_A3V1E4.pdf?nodeid=2431830&amp;vernum=-2" rel="noopener">&ldquo;detrimental effects&rdquo;</a> or damage the pipeline. The decision to order a hydrotest was punted to a later time and date.&nbsp;</p><p>Safety Tests to be 'Revisited'</p><p>&ldquo;The Board has imposed Condition 11&hellip;[and]&hellip; may revisit the issue of requiring hydrotesting prior to granting LTO (leave-to-operate),&rdquo; <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2431831/2428616/Reasons_for_Decision_OH%2D002%2D2013_%2D_A3V1E4.pdf?nodeid=2431830&amp;vernum=-2" rel="noopener">concludes the Board.</a></p><p>Before ordering a hydrotest the Board wants to review Enbridge&rsquo;s approach to hydrotesting (Condition 11) and the company&rsquo;s updated engineering assessment of Line 9&rsquo;s state (Condition 9). The assessment must include a reliability study of the inline pipeline inspection tool Enbridge uses to evaluate the threat of cracks and corrosion to the line.</p><p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/Map%20-%20Line%209.png"></p><p>The <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/706191/706437/770257/794782/B18-3__-_Attachment_1_to_3.1_-_Updated_Engineering_Assessment_-_A2Q7D7?nodeid=794789&amp;vernum=0" rel="noopener">engineering assessment</a> Enbridge submitted during the Line 9 hearings is primarily based on the pipeline's condition ten years ago.</p><p>Two other <a href="https://thenarwhal.ca/2013/10/21/pipeline-expert-90-percent-probability-line-9-rupture-dilbit">conditions strongly recommended by critics</a> of the project and the government of Ontario &ndash; a third party independent review of Enbridge&rsquo;s data on Line 9 and the requirement of $1 billion in liability insurance in the event of a spill &ndash; were also absent from the Board&rsquo;s conditions.</p><p>&ldquo;There&rsquo;s nothing of substance [in the conditions]. It&rsquo;s pretty basic stuff that&rsquo;s already required in legislation that already exists, like how you&rsquo;re going to mitigate the damage you&rsquo;re going to do to water crossings when you dig up a pipeline,&rdquo; said Adam Scott of Environmental Defence in an interview with <a href="http://www.nowtoronto.com/news/story.cfm?content=196975" rel="noopener">NOW Magazine</a>.</p><p><strong>Canadians Need To Determine Their Energy Future Outside of the NEB</strong></p><p>&ldquo;With these conditions, the Board is of the view that the IMP (integrity management plan) which Enbridge has implemented to date, and proposed steps going forward, sufficiently protect the facilities from cracking to enable safe operation of Line 9,&rdquo; the NEB<a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2431831/2428616/Reasons_for_Decision_OH%2D002%2D2013_%2D_A3V1E4.pdf?nodeid=2431830&amp;vernum=-2" rel="noopener">&nbsp;decision</a>&nbsp;reads.</p><p>Although Line 9&rsquo;s approval surprised no one, critics of the project held out hope for stronger conditions.</p><p>Dave Core, president of the Canadian Association of Energy Pipeline Landowners Associations (CAEPLA), has been dealing with pipelines, and the NEB for over twenty years and thinks Canadians need to rethink the regulator.</p><p>&ldquo;Canadians need to realize the NEB is doing exactly what it was designed to do over sixty years ago &ndash; protect pipeline company shareholder profits and protect politicians from the public. The Board cannot be relied on to protect the public, the environment, or landowners&rsquo; rights,&rdquo; says Core, who is originally a farmer from southwestern Ontario where Line 9 lies.</p><p>"We need to have a discussion about the future of the NEB and whether there even ought to be a future for the Board. It is only through ironclad contracts with the discipline of the courts and insurance that our safety, the environment and landowner stewardship responsibilities will be protected," Core told DeSmog Canada from Vancouver.&nbsp;</p><p>The fate of Line 9 now depends on the NEB deciding whether Enbridge has met all imposed conditions on Line 9&rsquo;s approval. Because Line 9 is an existing pipeline the project does not require approval from the federal government.&nbsp;</p><p><em>Image Credit: Enbridge, Robert Cory</em></p></p>
<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Derek Leahy]]></dc:creator>
						<category domain="post_tag"><![CDATA[bitumen]]></category><category domain="post_tag"><![CDATA[CAEPLA]]></category><category domain="post_tag"><![CDATA[Canadian Association of Energy Pipeline Landowner Associations]]></category><category domain="post_tag"><![CDATA[crude oil]]></category><category domain="post_tag"><![CDATA[Enbridge]]></category><category domain="post_tag"><![CDATA[Enbridge Line 9]]></category><category domain="post_tag"><![CDATA[Environmental Defence Canada]]></category><category domain="post_tag"><![CDATA[Equiterre]]></category><category domain="post_tag"><![CDATA[hydrostatic test]]></category><category domain="post_tag"><![CDATA[hydrotest]]></category><category domain="post_tag"><![CDATA[line 9]]></category><category domain="post_tag"><![CDATA[Line 9B]]></category><category domain="post_tag"><![CDATA[National Energy Board (NEB)]]></category><category domain="post_tag"><![CDATA[NEB]]></category><category domain="post_tag"><![CDATA[oilsands]]></category><category domain="post_tag"><![CDATA[OPLA]]></category><category domain="post_tag"><![CDATA[pipelines]]></category><category domain="post_tag"><![CDATA[tar sands]]></category>    </item>
	    <item>
      <title>Enbridge Line 9 Bitumen Pipeline Approved With Weak Conditions</title>
      <link>https://thenarwhal.ca/enbridge-line-9-bitumen-pipeline-approved-weak-conditions/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2014/03/07/enbridge-line-9-bitumen-pipeline-approved-weak-conditions/</guid>
			<pubDate>Fri, 07 Mar 2014 17:29:07 +0000</pubDate>			
			<description><![CDATA[The National Energy Board approved Enbridge&#8217;s Line 9 pipeline project Thursday. &#34;[This]&#160;decision shows the system is broken. Line 9 puts millions of people and every waterway in Ontario leading into Lake Ontario at risk,&#8221; said Sabrina Bowman, a climate campaigner with Environmental Defence Canada. Enbridge&#8217;s proposal to reverse Line 9 to flow from Sarnia, Ontario...]]></description>
			<content:encoded><![CDATA[<figure><img width="640" height="417" src="https://thenarwhal.ca/wp-content/uploads/2018/04/EDEF_PipelineMap-MedRes-withTitle.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/EDEF_PipelineMap-MedRes-withTitle.jpg 640w, https://thenarwhal.ca/wp-content/uploads/2018/04/EDEF_PipelineMap-MedRes-withTitle-300x195.jpg 300w, https://thenarwhal.ca/wp-content/uploads/2018/04/EDEF_PipelineMap-MedRes-withTitle-450x293.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/EDEF_PipelineMap-MedRes-withTitle-20x13.jpg 20w" sizes="(max-width: 640px) 100vw, 640px" /><figcaption><small><em></em></small></figcaption><hr></figure><p>The National Energy Board approved Enbridge&rsquo;s Line 9 pipeline project Thursday.<p>"[This]&nbsp;<a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2431831/2428616/Reasons_for_Decision_OH-002-2013_-_A3V1E4.pdf?nodeid=2431830&amp;vernum=1" rel="noopener">decision</a> shows the system is broken. Line 9 puts millions of people and every waterway in Ontario leading into Lake Ontario at risk,&rdquo; said Sabrina Bowman, a climate campaigner with <a href="http://environmentaldefence.ca" rel="noopener">Environmental Defence Canada</a>.</p><p>Enbridge&rsquo;s proposal to reverse Line 9 to flow from Sarnia, Ontario to Montreal, Quebec, increase its capacity by 20% and ship oilsands bitumen through the pipeline was approved by the Board (NEB) yesterday, but with <a href="https://docs.neb-one.gc.ca/ll-eng/llisapi.dll/fetch/2000/90464/90552/92263/790736/890819/2431831/2428616/Reasons_for_Decision_OH-002-2013_-_A3V1E4.pdf?nodeid=2431830&amp;vernum=1" rel="noopener">thirty conditions</a>. Bowman said the conditions do not protect people living along Line 9 from a spill. Line 9 is a 38-year old pipeline located in the most densely populated part of Canada.</p><p>&ldquo;The Enbridge pipeline 9 reversal with crude oil and diluted Bitumen is not wanted through our Traditional Territory and under the Thames River and we will seek other avenues to protect the land&rdquo; said Myeengun Henry, a band councilor with Deshkon Ziibi* <a href="http://www.cottfn.com" rel="noopener">(Chippewas of the Thames)</a> First Nation of southwestern Ontario.</p><p>&ldquo;We still need to be consulted and we are willing to listen,&rdquo; Henry told DeSmog Canada.</p><p>The federal government thus far has failed to fulfill its legal <a href="https://thenarwhal.ca/2013/11/05/federal-government-failed-consult-first-nations-line-9">duty to consult</a> with First Nations in Ontario and Quebec about the Line 9 project. This leaves the door wide open for First Nations of both provinces to challenge the Line 9 decision in court.</p><p><!--break--></p><p>&ldquo;This approval puts people and ecosystems at serious risk. After carefully studying this proposal, international pipeline expert [Richard Kuprewicz] gives a 90% likelihood of rupture within 5 years,&rdquo; said Canadian folk singer <a href="http://www.sarahharmer.com" rel="noopener">Sarah Harmer</a> who participated in the Line 9 hearings last October. Line 9 goes through her family&rsquo;s farm in Burlington, Ontario.</p><p>Kuprewicz told DeSmog Canada last October existing damage on Line 9 called 'stress corrosion cracking' coupled with the large pressure swings associated with shipping heavy crudes like bitumen make Line 9 <a href="https://thenarwhal.ca/2013/10/21/pipeline-expert-90-percent-probability-line-9-rupture-dilbit">&ldquo;high risk&rdquo;</a> for a rupture.</p><p>Two demands in particular made by critics of the project and the Ontario government were absent from the NEB&rsquo;s conditions: 1) for Line 9 to undergo a hydrostatic test to determine if the pipeline can operate at its maximum pressure and 2) a third-party independent review of Enbridge&rsquo;s data on Line 9.</p><p><img alt="" src="https://thenarwhal.ca/wp-content/uploads/files/line%209.jpg"></p><p>&ldquo;While the NEB does leave themselves room to order Enbridge to conduct a hydrostatic test, it should have respected this demand of the Province of Ontario outright,&rdquo; Harmer said from Kingston, Ontario.</p><p>&ldquo;Now the province needs to do their own independent review,&rdquo; she told DeSmog Canada.</p><p>The NEB in its decision stated it wants to review Enbridge&rsquo;s hydrostatic testing program, and the pipeline company&rsquo;s updated engineering assessment of Line 9 before deciding whether to order a hydrostatic test.</p><p>Aside from not allowing Enbridge to put the Line 9 project into operation immediately, the NEB more or less gave Enbridge everything they asked for.</p><p>&nbsp;&ldquo;The NEB&rsquo;s decision is another clear indication that Canada&rsquo;s long standing environmental safeguards have been gutted to pander to the oil industry,&rdquo; Bowman of Environmental Defence told DeSmog.</p><p>Because Line 9 is an existing pipeline the NEB&rsquo;s decision is final. Only projects where forty kilometers or more of pipeline are being built require approval from the federal government.</p><p>One hundred people have signed an <a href="http://you.leadnow.ca/petitions/line-9-pledge-of-resistance" rel="noopener">online pledge</a> to support or engage in civil disobedience to stop the Line 9 project.</p><p>More on the Line 9 decision to come on DeSmog Canada.</p><p><em>*Deshkon Ziibi is the Anishinaabe (Ojibwe) name for the &ldquo;Chippewas of the Thames.&rdquo;</em></p><p><em>Image Credits: Environmental Defence Canada, Enbridge</em></p></p>
<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Derek Leahy]]></dc:creator>
						<category domain="post_tag"><![CDATA[bitumen]]></category><category domain="post_tag"><![CDATA[Chippewas of the Thames]]></category><category domain="post_tag"><![CDATA[crude oil]]></category><category domain="post_tag"><![CDATA[Enbridge]]></category><category domain="post_tag"><![CDATA[Environmental Defence Canada]]></category><category domain="post_tag"><![CDATA[hydrostatic test]]></category><category domain="post_tag"><![CDATA[hydrotest]]></category><category domain="post_tag"><![CDATA[line 9]]></category><category domain="post_tag"><![CDATA[Myeengun Henry]]></category><category domain="post_tag"><![CDATA[National Energy Board (NEB)]]></category><category domain="post_tag"><![CDATA[oilsands]]></category><category domain="post_tag"><![CDATA[pipelines]]></category><category domain="post_tag"><![CDATA[Sarah Harmer]]></category><category domain="post_tag"><![CDATA[tar sands]]></category>    </item>
	</channel>
</rss>