
<rss 
	version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/" 
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:media="http://search.yahoo.com/mrss/"
>

<channel>
	<atom:link href="https://thenarwhal.ca/feed/" rel="self" type="application/rss+xml" />
	<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
	<link>https://thenarwhal.ca</link>
  <description>The Narwhal’s team of investigative journalists dives deep to tell stories about the natural world in Canada you can’t find anywhere else.</description>
  <language>en-US</language>
  <copyright>Copyright 2026 The Narwhal News Society</copyright>
	<lastBuildDate>Thu, 04 Jun 2026 15:19:48 +0000</lastBuildDate>
	<image>
		<title>The Narwhal | News on Climate Change, Environmental Issues in Canada</title>
		<url>https://thenarwhal.ca/wp-content/uploads/2026/03/the-narwhal-rss-icon.png</url>
		<link>https://thenarwhal.ca</link>
		<width>144</width>
		<height>144</height>
	</image>
	    <item>
      <title>It’s Official: Site C Dam Could Power Fracking Operations in Northeast B.C.</title>
      <link>https://thenarwhal.ca/it-s-official-site-c-dam-could-power-fracking-operations-northeast-b-c/?utm_source=rss</link>
			<guid isPermaLink="false">http://localhost.com/narwhal/2015/06/12/it-s-official-site-c-dam-could-power-fracking-operations-northeast-b-c/</guid>
			<pubDate>Fri, 12 Jun 2015 21:24:44 +0000</pubDate>			
			<description><![CDATA[The electricity created by the controversial Site C dam &#8212; long touted for producing enough electricity for 450,000 homes &#8212; could end up powering natural gas fracking operations in northeast B.C. The Prince George Citizen reported on Wednesday that for the first time BC Hydro is considering Site C as a power source for its...]]></description>
			<content:encoded><![CDATA[<figure><img width="625" height="480" src="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3.jpg" class="attachment-banner size-banner wp-post-image" alt="" decoding="async" fetchpriority="high" srcset="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3.jpg 625w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3-612x470.jpg 612w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3-450x346.jpg 450w, https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3-20x15.jpg 20w" sizes="(max-width: 625px) 100vw, 625px" /><figcaption><small><em></em></small></figcaption></figure> <p>The electricity created by the controversial <strong><a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a></strong> &mdash; long touted for producing enough electricity for 450,000 homes &mdash; could end up powering natural gas fracking operations in northeast B.C.</p>
<p>The <a href="http://www.princegeorgecitizen.com/news/local-news/site-c-could-power-new-transmission-line-in-peace-1.1965397" rel="noopener">Prince George Citizen reported</a> on Wednesday that for the first time BC Hydro is considering <a href="https://thenarwhal.ca/site-c-dam-bc">Site C</a> as a power source for its proposed Peace Region Electrical Supply project, a major transmission line project in northeast B.C.</p>
<p>If the Site C dam gets built (it&rsquo;s currently facing several <a href="http://www.vancouversun.com/business/energy/Legal+actions+could+still+delay+Site+construction/11034263/story.html" rel="noopener">legal challenges</a>) and BC Hydro moves forward with the proposed route for the transmission line, natural gas drillers between Dawson Creek and Chetwynd could plug directly into the grid.</p>
<p><!--break--></p>
<p>The Citizen reports that Hydro expects the transmission project won&rsquo;t be in service until 2022, making Site C &mdash; set for completion in 2025 &mdash; a viable option.</p>
<p>The subject of what Site C&rsquo;s power is required for has spurred intense debate. Some have argued that the dam is needed to power B.C.&rsquo;s proposed liquefied natural gas (LNG) plants. However, a <a href="https://thenarwhal.ca/2014/05/27/7-9-billion-dollar-question-is-site-c-dam-electricity-destined-lng-industry">DeSmog Canada investigation</a> last year indicated that was unlikely to be the case due to timing and transmission constraints.</p>
<p>This week&rsquo;s news, however, indicates Site C&rsquo;s power could be used to produce the gas the province plans to export via LNG plants.</p>
<p>"It&rsquo;d always been in the back of the mind that Site C was possible, but until it got approved it wasn't something we were looking into in a great amount of detail," BC Hydro spokesperson Lesley Wood told the <a href="http://www.princegeorgecitizen.com/news/local-news/site-c-could-power-new-transmission-line-in-peace-1.1965397" rel="noopener">Prince George Citizen</a>.</p>
<p>With a price tag of $8.8 billion, the <a href="https://thenarwhal.ca/site-c-dam-bc">Site C dam</a> is the most expensive public project in B.C. history. Because it's being proposed by a crown corporation, the costs will ultimately be borne by taxpayers and BC Hydro customers. If built, the dam will flood an 83-kilometre stretch of the fertile Peace Valley.</p>
<p>Work has already started to upgrade power lines in the Groundbirch area east of Dawson Creek, where the province has been experiencing the "most dramatic single-industry driven regional load growth BC Hydro has ever seen," Wood told the Citizen.</p>
<p>The natural gas is located in the Montney Play region, which contains unconventional tight gas and shale gas. The gas is accessed through a process called hydraulic fracturing &mdash; or &ldquo;fracking&rdquo; &mdash; which involves blasting a mixture of water and chemicals underground to fracture the rock formation and release the gas.</p>
<p>A <a href="http://www.desmogblog.com/2015/06/04/epa-study-fracking-contaminates-water-supplies" rel="noopener">fracking study</a> released last week by the U.S. Environmental Protection Agency found fracking puts drinking water supplies at risk of contamination. Further, <a href="https://thenarwhal.ca/2014/10/27/b-c-lng-strategy-won-t-help-solve-global-climate-change-new-pembina-institute-report">exporting LNG will not help combat climate change</a>, according to a report from the Pembina Institute last year. A report in <a href="http://www.desmogblog.com/2014/10/20/natural-gas-bridge-fuel-excellent-political-solution-fails-climate-solution" rel="noopener">Nature</a> last year also found cheap abundant natural gas will delay efforts to reduce carbon emissions.</p>
<p>Site C is facing growing opposition, despite BC Hydro hoping to start construction in July.</p>
<p>In May, a U.S. energy economist said the power from the dam is <a href="http://www.theglobeandmail.com/news/british-columbia/power-from-site-c-dam-dramatically-more-costly-than-thought-expert/article24608803/" rel="noopener">dramatically more costly</a> than previously thought.</p>
<p>Earlier this year, the chair of the joint review panel that reviewed the Site C dam <a href="https://thenarwhal.ca/2015/03/10/exclusive-b-c-government-should-have-deferred-site-c-dam-decision-chair-joint-review-panel">told DeSmog Canada</a> that the province should have waited on making a decision to go ahead with the project. <a href="https://thenarwhal.ca/2015/03/10/exclusive-b-c-government-should-have-deferred-site-c-dam-decision-chair-joint-review-panel">Chair Harry Swain</a> also called the province&rsquo;s failure to investigate alternatives a &ldquo;dereliction of duty.&rdquo;</p>

<p><em><strong>The Narwhal’s reporters are telling environment stories you won’t read about anywhere else. Stay in the loop by <a href="https://thenarwhal.ca/newsletter/?utm_source=rss">signing up for our free weekly dose of independent journalism</a>.</strong></em></p>]]></content:encoded>
      <dc:creator><![CDATA[Emma Gilchrist]]></dc:creator>
						<category domain="post_tag"><![CDATA[BC Hydro]]></category><category domain="post_tag"><![CDATA[Chetwynd]]></category><category domain="post_tag"><![CDATA[dawson creek]]></category><category domain="post_tag"><![CDATA[EPA]]></category><category domain="post_tag"><![CDATA[fracking]]></category><category domain="post_tag"><![CDATA[Harry Swain]]></category><category domain="post_tag"><![CDATA[hydraulic fracturing]]></category><category domain="post_tag"><![CDATA[Lesley Wood]]></category><category domain="post_tag"><![CDATA[Liquefied Natural Gas]]></category><category domain="post_tag"><![CDATA[LNG]]></category><category domain="post_tag"><![CDATA[Montney Play]]></category><category domain="post_tag"><![CDATA[Prince George Citizen]]></category><category domain="post_tag"><![CDATA[shale gas]]></category><category domain="post_tag"><![CDATA[Site C]]></category><category domain="post_tag"><![CDATA[Site C dam]]></category><category domain="post_tag"><![CDATA[Tight Gas]]></category>			<media:content url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3-612x470.jpg" fileSize="4096" type="image/jpeg" medium="image" width="612" height="470"><media:credit></media:credit></media:content><media:thumbnail url="https://thenarwhal.ca/wp-content/uploads/2018/04/IMG_0548-3-612x470.jpg" width="612" height="470" />    </item>
	</channel>
</rss>