In its largest capital project in history, Enbridge plans to do what Transcanada so far can't — ship more than half a million barrels of heavy oil across the U.S. border without President Barack Obama's direct approval.

Late Monday evening, Enbridge announced plans for its largest capital project in history— a $7 billion replacement of its Line 3 pipeline.

The existing Line 3 pipeline is part of Enbridge’s extensive Mainline system. The 34-inch pipe was installed in 1968 and currently carries light oil 1,660 km from Edmonton to Superior, Wis. 

While the Line 3 pipeline currently has a maximum shipping capacity of 390,000 barrels of light crude oil per day, pumping stations along the line have a much larger capacity (and can accommodate heavier oils). Enbridge plans to take advantage of this. Under the company's replacement plans, the new Line 3 pipeline will be widened by two inches, and built "using the latest available high-strength steel and coating technology." By the time it goes into service in 2017, Line 3 will ship 760,000 barrels of oil across the border every day, nearly double what it currently moves. 

At the same time, the new Line 3 will be designated as ‘mixed service,’ allowing it to carry a variety of different types of oil from heavy to light. Speaking on a conference call with investors and media this morning, Enbridge CEO Al Monaco said "my lean would be more towards the heavier side, but it will carry both."

Line 3 will continue to operate at full current capacity during the construction period. All construction is expected to occur within the existing pipeline corridor.

Enbridge Liquids Pipeline System

No presidential permit required (because it already has one)

Unlike the Keystone XL pipeline or its predecessor Line 67 (also known by its more jovial name ‘Alberta Clipper’), this project is classified as "replacement" or "maintenance," meaning it operates under an existing presidential permit and does not require a new one. Enbridge proponents made a point of repeatedly affirming this during Tuesday's call with investors and media. 

Construction will be managed by two separate companies. The Edmonton to Hardisty segment and the Hardisty, Alta., to Gretna, Man., segments will be managed by Enbridge’s wholly-owned Canadian subsidiary, Enbridge Pipelines Inc. Enbridge Energy Partners, L.P. will take responsibility for approvals and construction of the segment between Neche, N.D., and Superior, Wis.

Notably, both projects omit discussion of the tiny — but crucial — 3 km pipeline segment that crosses the Canada/U.S. border and links Gretna, Man., to Neche, N.D. On the U.S. webpage for the Line 3 project, Enbridge states:

"Segments of Line 3 from the Canadian border to Neche, N.D., and near the Minnesota/Wisconsin border to the Superior terminal are being replaced under separate segment replacement projects." The Canadian webpage has a similar message.

At the moment, it is not clear what those replacement projects are, or what stage of approval they are in. Enbridge did not return a call to clarify details.

Two Keystone XL pipelines per day

With its announcement, the Line 3 replacement joins three other large-scale expansion projects by Enbridge in varying stages of development or approval. 

  • The 525,000 barrels per day Northern Gateway pipeline connecting Edmonton with Kitimat, B.C., has received a positive recommendation from the National Energy Board and will see a decision from the federal cabinet in the next three months.  
  • Within the next few weeks, a decision is expected on the proposed reversal of Ontario and Quebec’s Line 9B pipeline. Currently the pipeline ships oil received via tankers from a Montreal terminal to Sarnia, Ont. If approved, the reversed pipeline would ship 300,000 barrel per dday of Canadian-sourced oil from Sarnia to Montreal for international export. 
  • Enbridge has already completed Phase 1 of its planned expansion to the Alberta Clipper pipeline, increasing its capacity from 450,000  to 570,000 barrels per day. On Feb. 10, Canada’s National Energy Board approved Phase 2 of the pipeline expansion, allowing it to ship at its maximum capacity of 800,000 barrels per dday. Approval of the project on the U.S. side is currently delayed while the State Department updates its environmental regulations. 
  • Applications for the Line 3 replacement project will be filed in late 2014.

 

Should all four of these projects go ahead, they will collectively increase Enbridge’s daily shipping volume by approximately 1.5 million barrels per day, or the equivalent of nearly two Keystone XL pipelines. The Keystone XL pipeline is expected to transport 830,000 bpd.

Addendum: Here's the math behind the projected Enbridge shipping volume. 

CURRENT SHIPPING VOLUMES: (Barrels Per Day)

  • Line 9: 0 (its current 240,000 barrel per day capacity does not include Canadian-sourced oil, and flows in the opposite direction)
  • Northern Gateway: 0
  • Line 3: 390,000
  • Alberta Clipper: 450,000
  • TOTAL: 840,000 barrels per day

 

FUTURE SHIPPING VOLUMES (BPD):

  • Line 9: 300,000
  • Northern Gateway: 525,000
  • Line 3: 760,000
  • Alberta Clipper: 800,000
  • TOTAL: 2, 385,000 barrels per day

 

For a difference of 1,545,000 barrels per day or the equivalent of 1.86 Keystone XLs.

Image Credit: Mack Male via Flickr

We’ve got big plans for 2024
Seeking out climate solutions, big and small. Investigating the influence of oil and gas lobbyists. Holding leaders accountable for protecting the natural world.

The Narwhal’s reporting team is busy unearthing important environmental stories you won’t read about anywhere else in Canada. And we’ll publish it all without corporate backers, ads or a paywall.

How? Because of the support of a tiny fraction of readers like you who make our independent, investigative journalism free for all to read.

Will you join more than 6,000 members helping us pull off critical reporting this year?
We’ve got big plans for 2024
Seeking out climate solutions, big and small. Investigating the influence of oil and gas lobbyists. Holding leaders accountable for protecting the natural world.

The Narwhal’s reporting team is busy unearthing important environmental stories you won’t read about anywhere else in Canada. And we’ll publish it all without corporate backers, ads or a paywall.

How? Because of the support of a tiny fraction of readers like you who make our independent, investigative journalism free for all to read.

Will you join more than 6,000 members helping us pull off critical reporting this year?

Yellowknife to Fort McMurray: lessons from the frontlines of Canada’s worst wildfires

With an uncontrollable wildfire burning its way toward Yellowknife in late July 2023, the senior civil servant in charge of the Northwest Territories capital, Sheila...

Continue reading

Recent Posts

Thousands of members make The Narwhal’s independent journalism possible. Will you help power our work in 2024?
Will you help power our journalism in 2024?
That means our newsletter has become the most important way we connect with Narwhal readers like you. Will you join the nearly 90,000 subscribers getting a weekly dose of in-depth climate reporting?
A line chart in green font colour with the title "Our Facebook traffic has cratered." Chart shows about 750,000 users via Facebook in 2019, 1.2M users in 2020, 500,000 users in 2021, 250,000 users in 2022, 100,000 users in 2023.
Readers used to find us on Facebook. Now we’re blocked
That means our newsletter has become the most important way we connect with Narwhal readers like you. Will you join the nearly 90,000 subscribers getting a weekly dose of in-depth climate reporting?
A line chart in green font colour with the title "Our Facebook traffic has cratered." Chart shows about 750,000 users via Facebook in 2019, 1.2M users in 2020, 500,000 users in 2021, 250,000 users in 2022, 100,000 users in 2023.
Readers used to find us on Facebook. Now we’re blocked
Overlay Image